Laserfiche WebLink
CONTENTS <br /> 1.0 INTRODUCTION 1 <br /> 2.0 PROJECT ROLES 1 <br /> 3.0 SYSTEM COMPONENTS 1 <br /> 3.1 Sewage Treatment System Components 2 <br /> 4.0 PROJECT SCHEDULE 3 <br /> 5.0 CONSTRUCTION SPECIFICATIONS 3 <br /> 5.1 General Specifications 3 <br /> 5.2 Piping and Plumbing 4 <br /> Materials 4 <br /> Workmanship 4 <br /> 5.3 Tanks 5 <br /> Materials 5 <br /> Workmanship 5 <br /> 5.4 Effluent Filter 6 <br /> Materials 6 <br /> Workmanship 6 <br /> 5.5 Universal Flow Inducer and Flow Inducer Tower 6 <br /> Materials\ 6 <br /> Workmanship 7 <br /> 5.6 AdvanTex(AX20) Secondary Treatment Pod 7 <br /> Materials 7 <br /> Workmanship 7 <br /> 5.7 Pumps, Controls, and Alarms 7 <br /> Materials 7 <br /> Workmanship 7 <br /> 5.8 Hydrosplitter 8 <br /> Materials 8 <br /> Workmanship 8 <br /> 5.9 Subsurface Soil Absorption System- Standard Trenches 8 <br /> Materials 8 <br /> Workmanship 8 <br /> 6.0 INSPECTIONS 9 <br /> 6.1 Pre-Construction Conference 9 <br /> 6.2 Construction Inspections 9 <br /> Valley—Albany,OR East Salem Seventh-Day Adventist Church I P&S <br /> Doc:2023240054 East Salem Church PS.docx November 2023 I Page iii <br />