My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12015954
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
20-XXXXXX
>
12015954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 8:00:17 PM
Creation date
1/19/2024 2:15:49 PM
Metadata
Fields
Template:
Permits
Permit Address
5295 ST LOUIS RD NE
Permit City
Gervais
Permit Number
555-20-002257-PRMT
Parcel Number
052W20 00300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Permit Number: 555-20-002257-PRMT Date:April 21,2020 <br /> Completed By: Matthew Puntney,REHS <br /> Project Address: 5295 St.Louis Road NE,Gervais <br /> 052W20 00300 <br /> SEPTIC SYSTEM MAJOR REPAIRER P I RED <br /> Wastewater Specialist must specifically approve this site for installation from November <br /> 1st to April 1st. This may include a field visit directly prior to installation <br /> THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTED from any vehicular <br /> traffic, livestock and farming activities. Other activities such as excavating or filling, <br /> driveway placement, paving or other similar activities that alter the natural soil <br /> conditions will adversely affect the soil and the septic system function and lead to <br /> premature system failure. The area must not be subjected to excessive saturation due <br /> to artificial drainage of ground surfaces, driveways, building downspouts or other <br /> sources. The areas of the initial septic system and the future repair system must both <br /> be protected. <br /> MAINTAIN PERMANENT ACCESS to septic tank for pumping and service. The septic <br /> tank should be pumped and inspected by a licensed septic tank pumping service before <br /> sludge and scum accumulations reach 30% of the tank liquid operating volume. <br /> Pumping every 3 to 5 years is an average interval. The septic tank is a reservoir for <br /> the solid materials in the sewage waste stream. Excessive accumulation of these solid <br /> materials in the septic tank will cause the solids to wash out of the tank and into the <br /> drainfield. This will cause irreversible damage to the drainfield and will eventually lead <br /> to a system failure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.