My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11987483
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
11987483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2023 1:29:17 PM
Creation date
12/21/2023 8:34:11 AM
Metadata
Fields
Template:
Permits
Permit Address
3011 MAHALO CT SE
Permit City
Salem
Permit Number
555-23-001975-PRMT
Parcel Number
083W24A 01800
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AWARNING ELECTRICAL SHOCK HAZARD ! , : : , , EXPLOSION OR FIRE HAZARD <br /> %wit Disconnect power before installing or servicing this Do not use this product with flammable liquids. <br /> product.A qualified service person must install and l ' .�? Do not install in hazardous locations as defined by <br /> service this product according to applicable electrical t<r. ` National Electrical Code,ANSI/NFPA 70. <br /> and plumbing codes. <br /> Failure to follow these precautions could result in serious injury or death. Replace product immediately if switch cable becomes damaged <br /> or severed. Keep these instructions with warranty after installation.This product must be installed in accordance with National Electric Code,ANSI/ <br /> NFPA 70 so as to prevent moisture from entering or accumulating within boxes,conduit bodies,fittings,float housing,or cable. <br /> For detailed specifications on this product, or for the complete line of SJE-Rhombus® <br /> panel, alarm, and switch products, visit our web-site at www.sjerhombus.com. <br /> INSTALLING THE FLOAT SWITCH Figure A <br /> 1. Place the cord into the clamp as shown in Figure A. <br /> 2. Locate the clamp at the desired activation level and secure the p <br /> clamp to the discharge pipe as shown in see Figure A. , ` <br /> Note: Do not install cord under hose clamp. � r� <br /> 3. Tighten the hose clamp using a screwdriver. Over tightening `'� <br /> may result in damage to the plastic clamp. Make sure the float 3.5 inch(9 cm) <br /> cable is not allowed to touch the excess hose clamp band during tether length <br /> operation. <br /> 4. Wire cable leads directly into control device as shown in Figures <br /> B&C. <br /> 5. Check installation.Allow system to cycle to insure proper Figure B - TAX'Standard <br /> operation. Note:All hose clamp components are made of 18-8 <br /> stainless steel material. See your SJE-Rhombus®supplier for F-- <br /> replacements. <br /> INSTALLING THE ALARM o '% <br /> / /I - <br /> 1. Mount alarm box using existing holes in back of box.To ensure (.' 0 I > �° <br /> water-tight seal, use screws and sealing washers included with �� �� o 0 <br /> alarm. Note: Screws are to be located over wall stud or used with 1-float <br /> I I �Gx)l2"Host <br /> a wall anchor sized for a#8 x 1.25 self tapping screw. ITs-neutral <br /> 2. Determine"conduit-in"locations on alarm as shown in Figures B —mid 10 014-Ilse <br /> &C. Note: When used with a pump application, connect alarm (y0-.)____rg oyround <br /> to a circuit separate from the pump circuit.This allows alarm to <br /> continue to operate if the pump circuit fails. ° ! ° <br /> O <br /> 3. Drill holes for conduit entry,taking care not to damage bosses ` <br /> recommended recommendedinside alarm box. power conduit floatwdtah <br /> 4. Attach conduit. In locationlacstion <br /> If alarm includes premounted terminal block option, refer now incoming O 0120 14 <br /> to the Terminal Block Option Wiring Instructions. <br /> 5. Bring float switch cable through conduit and wire to terminal Figure C -TAXI with Auxiliary Contacts <br /> block positions 1 and 2 as shown in Figures B&C. optional auwiiary <br /> --\ <br /> 6. Wire power conductors to terminal block positions 3 and 4 and contacts connection <br /> (see wire labeling) \ <br /> ground wire to ground termination post as shown in Figures B& ,. <br /> C. Note: If terminal block option is used, attach ground wire as C INT�B III <br /> shown in Figure A of Terminal Block Option Wiring Instructions. .Ls i to` °JJ ° <br /> 7. If remote device is used, connect wires as shown in Figure C (di o 110, Qo <br /> „ <br /> using supplied wire nuts. I o' o to of <br /> ,---4.-8. Attach alarm box cover using the four pre-installed screws. ,---4.-1-float <br /> 9. Turn on power. Light on switch should come on. I I I I i12-Host <br /> a-neutral <br /> 10. Check installation by manually tipping the float.The horn and o o :7711 4-line <br /> beacon should turn on. 1001 <br /> 11. Push silence switch to test silence feature. �us� !ground <br /> \'NFU <br /> 12. Test unit once per week to insure proper operation. °L' 0 <br /> o ° <br /> recommended romrmerded <br /> power conduit float/wads <br /> In location conduit In <br /> location <br /> Incoming wire size 14-22 Awg <br /> SJL ' <br /> ombus <br /> 22650 County Highway 6 N P.O. Box 1708 • Detroit Lakes,Minnesota 56502 USA <br /> 1-888-DIAL-SJE(1-888-342-5753) • Phone: 218-847-1317 • Fax: 218-847-4617 • E-mail:sje@sjerhombus.com <br /> Instl.Instr.PN 1024984C Model TAXT ©SJE-Rhombus 08112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.