Laserfiche WebLink
Septic Permit 555-23-004764-PRMT Page 4 of 4 <br /> 6,crz <br /> Date Cefa�cat ISscted t2l18l2023e a s �s �; � a� a r3 � I <br /> WOrklescnpttOn ' 3ti1=P <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel.Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of Consumer <br /> and Business Services,Building Codes Division,or the municipality with jurisdiction,is required for pump wiring <br /> installation. <br /> install the pump and system components in accordance with the approved pump curve and specifications. <br /> install the pump and system components in accordance with the approved pump curve and specifications. <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer installation <br /> guidelines. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the <br /> effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Effluent filter required at pump vault <br /> •Equal distribution,all trench bottoms must be at the same elevation.Use Distribution box(es). <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> r <br /> SaHAT, to r Gonnpletua n. <br /> System Inspection: No Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: Yes <br /> Comments: N/A <br /> CompiEfedl�t.Sp�C#Ions . ✓_,.e. @ '�° f 5x �ap .a,.. <br /> Inspector Inspection Inspection Date Inspection Result <br /> Danielle Brown 7999 Final Septic 12/18/2023 Approved <br /> Aidan Bammes 7020 P -cover 08/24/2023 Approved <br /> nielle Brown Onsite Wastewater Inspector 2 <br /> CALL BEFORE YOU DIG—ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 12/19/23:9:05:59AM ONS_OnsiteCSC_pr <br />