Laserfiche WebLink
Onsite Permit 555-20-009082-PRMT Page 7 of 7 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555042092555 <br /> Schedule using the Oregon ePermitting Inspection App,search"epermitting"in the app store <br /> -sue v- y . ✓r " <br /> 8f8'ISS1ted7/21 I 77 <br /> EXprraftOna1 <br /> WorkAssi A,k10064.6fiREIRs'mAJ:K. ft Pt 3 3 i wRES NEW LQCATiON rr 3 <br /> -�- � 3 , ;:dl '_.... - ... ..... .. .<.Wea�F. m 3` H ar.,.../��/�.� .._ lv:.»,,g ;..' 'sls/ j , .,, <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at <br /> http://www.deq.state.orus/wq/onsite/onsite.htrn <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received before <br /> the permit expiration date. Reinstatement of a permit may be granted if an application for permit reinstatement <br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another <br /> person may be granted if an application for permit transfer is received before the permit expiration date and no <br /> other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil. No alterations of the <br /> natural site conditions such as soil removal or filling, or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent. Do not <br /> install system when soil moisture, high groundwater, adverse weather, or other conditions that could affect the <br /> quality of installation or reliability of the system are present. If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction,alteration, or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection. Faxed copies are acceptable for inspection request purposes only. Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth, masonry,stumps,waste construction materials,or <br /> other materials that could damage the system. Be sure that the untreated building paper,filter fabric, or other <br /> material approved by the agent is completely covering all drain media where required prior to backfill.The <br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been <br /> issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways, covering with asphalt or <br /> concrete,filling, cutting,or other soil modifications. <br /> 4/m:tin/it( a ato• e-#-A)/61/ (17 .)- <br /> /57,11 <br /> Kimberlee Aldrich Onsite Wastewater Specialist 2 1/7/21 <br /> 1/15/21:8:08:09AM Page 7 of 7 ONS_OnsitePermit_pr <br /> L <br />