Laserfiche WebLink
Onsite Permit 555-20-009082-PRMT Page 6 of 7 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555042092555 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> 0.ate i stied '1C112"t ° I. £, 1 Expiation date:117/22 <br /> Wo1 REPAIR REPL 3 BDRM RES NE QCAT10 . <br /> Conditions of approval <br /> •All tanks must be tested for water-tightness and have a water-tight riser to the <br /> ground surface. Twenty- inch minimum diameter if less than 36-in deep (thirty-inch <br /> minimum diameter if greater than 36-in deep). <br /> •Maintain access to septic tank for pumping and,service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes <br /> made by the agent. <br /> All work is to conform to OAR 340, Division 71 and 73. Make no changes in system <br /> location or specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see <br /> DEQ website at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic <br /> tape must be placed on top of the effluent sewer or pressure transport pipe from tank <br /> to drainfield. <br /> •Effluent sewer must extend at least 5 feet beyond the septic tank before <br /> connecting to the distribution unit. It must be installed with a minimum fall of 4 inches <br /> per 100 feet and at least 2 inches of fall from one end of the pipe to the other. In <br /> addition, there must be a minimum difference of 8 inches between the invert of the <br /> septic tank outlet and either the invert of the headerto the distribution pipe of the <br /> highest lateral in a serial distribution field or the invert of the header pipe to the <br /> distribution pipes of an equal distribution absorption field <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> 1/15/21:8:08:09AM Page 6 of 7 ONS_OnsitePermit_pr <br />