My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11189691
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
11189691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 1:48:53 PM
Creation date
8/11/2022 11:14:14 AM
Metadata
Fields
Template:
Permits
Permit Address
1785 EIDER ST SE
Permit City
Jefferson
Permit Number
555-22-006542-EVAL
Parcel Number
103W02BA02200
Permit Type
Site Evaluation
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Site Evaluation 555-22-006542-EVAL Page 4 of 4 <br /> Date issued 0810812022 <br /> Application statua Site, ual[atron Appri ved <br /> Work description SE FUTURE 3 BDRM SFD(COMBINING 5 LOTS INTO 1) <br /> Conditions of approval: <br /> the replacement drainfield area. The criteria used for this site evaluation can be found in Oregon Administrative Rules(OAR) <br /> 340-071. <br /> •In the site inspection,the following features are evaluated: <br /> •-Soil types-how well they drain and other indicators of good soil structure for treatment <br /> •-Depth to evidence of groundwater <br /> •-Wells located on the site or adjacent sites <br /> •-Slopes, escarpments, ground surface variations,topography <br /> •-Creeks or springs on the site or adjacent properties <br /> •-Whether the soils have been disturbed <br /> --Setbacks from property lines, buildings,water lines, and other utilities <br /> •-Other site features that could affect the placement of your onsite system <br /> • <br /> •Next Step—Construction-Installation Permit <br /> •When you are ready to proceed with system construction, contact our office to get a permit application package. Detailed <br />' plans are required for the system prior to the issuance of the permit. Two sets of plans for the system must be submitted at <br /> the time of application for the installation permit. The permit must be issued by Marion County before you can start <br /> construction. <br /> •You can find a list of licensed septic system installers on the DEQ web site <br /> http://www.deq.state.or.us/wq/onsite/sdssearch.asp. Once the plans are submitted they will be reviewed before the <br /> installation permit can be approved and issued. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system. Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site, or placement of wells or utilities, etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9 senior DEQstaff6 A. A nl r person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being • <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that s co pliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdenso or impractica. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> ?! VI) (fig93-- <br /> 33 <br /> 01/10A/ck? <br /> eAlh Onsite tewater Specialist 2 8/8 22 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 8/8/22:9:38:14AM Page 4 of 4 ONS_OnsiteEvaluationpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.