Laserfiche WebLink
Onsite Permit 555-21-006090-PRMT <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555030160033 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> • • r " i,� a,��, �,°�'� � �^� Ecpirat[an�da a 612�122 <br /> i sueu: +1 ', g P S 1 a a k, 3'gi a s d 'm a " ' a'` , 6 <br /> Dats lss vre �2412 t,� w$ :.ao b :; � : § a 7A .r e,F, tw a�,„,+ a ens <br /> �BP$ °$ ° 9 a.• p =.c w a w, �, a =$" ,r rax r�" "$,'fp� 9'": <br /> lfirnrk",descriptiOn°NEW INSTALLATF�3 BDRM!MC1 ? � i it P „•Vey 1 ae ` <br /> `Po 5� q rya " a xT IOC "W, z :, + C�' : :sts ,fiv <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.usiwq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit.Renewal of a permit may be granted if an application for permit renewal is received before <br /> the permit expiration date.Reinstatement of a permit may be granted if an application for permit reinstatement <br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another <br /> person may be granted if an application for permit transfer is received before the permit expiration date and no <br /> other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not <br /> install system when soil moisture,high groundwater,adverse weather,or other conditions that could affect the <br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of <br /> Satisfactory Completion (CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials,or <br /> other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or other <br /> material approved by the agent is completely covering all drain media where required prior to backfill.The <br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been <br /> issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt or <br /> concrete,filling,cutting,or other soil modifications. <br /> Onsite Wastewater Specialist'2 6/24/21 <br /> f 1-+.?coal.*i'tO lei /a <br /> 6/24/21:9:21:02AM <br /> Page 3 of 3 ONS_OnsitePermit_pr <br />