My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11189690
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11189690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2022 2:56:14 PM
Creation date
8/11/2022 11:14:11 AM
Metadata
Fields
Template:
Permits
Permit Address
22427 RIVER RD NE
Permit City
St paul
Permit Number
555-21-006090-PRMT
Parcel Number
042W04 01000
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-21-006090-pRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555030160033 <br /> Schedule using the Oregon ePermitting Inspection App,search"epermitting"in the app store <br /> n ,IN TALL.PhrTit ,'B RM M . <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: <br /> Pump to drainfield reqd: 12 in.s <br /> Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed <br /> by a person certified by the system manufacturer in accordance with OAR 340-071-0600 and 0650.See <br /> Alternative Treatment Technology rules at OAR 340-071-0345. <br /> -ATT treatment standard 1 required. <br /> -The owner of an ATT system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect,adjust and maintain the onsite system.The maintenance provider must submit an <br /> annual report and annual evaluation fee. <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain <br /> access to septic tank for pumping and service. <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services,Building Codes Division,or the municipality with jurisdiction,is required for <br /> pump wiring installation. <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer <br /> installation guidelines. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top <br /> of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •The hydrosplitter must be located at least 6 inches higher than the piping in the highest disposal trench to <br /> ensure that effluent in the top line does not spill back into the hydrosplitter. <br /> • <br /> • <br /> 6/24/21:9:21:02AM Page 2 of 3 <br /> ONS_OnsitePermit_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.