My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
556291
Images9
>
Assessors
>
Administration
>
Reviews and Appeals
>
556291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 11:45:19 AM
Creation date
11/15/2021 9:45:21 AM
Metadata
Fields
Template:
Assessor
Account Number
556291
Assessor Doc Type
Review
Log Number
T21-037
Tax Year
2021-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
49930 N Santiam Hwy SE SITE VISIT REPORT <br /> Idanha, OR 97350-9503 State Farm Claim No. 37-11K4-75P <br /> / r' a k411.' <br /> e <br /> +^ '1rt � ' it r 1s✓�' �C o 4; y 4,. <br /> .1, <br /> , <br /> SHED METAL ROOF: WEST OVERVIEW, FASCIA & RAKE BOARDS [FIGURES 58, 59] <br /> The eave block on the West side South end was dislodged outward and <br /> appeared to have been relatively recently, based on splitting of the paint membrane. <br /> The end of the block was out approximately 1/2". This location corresponds to the <br /> vapor barrier on the interior that was stapled to the wall at the interior Southwest <br /> corner. It appears that the staples were hammered, which knocked the block <br /> outward. It is recommended that the block be put back into place prior to the prep <br /> work for re-painting the building. [See Figures 60, 61, & 62 below.] <br /> -.+4.-11.11116111111110 -'t <br /> N <br /> f <br /> 1. <br /> SHED: SOUTHWEST EAVE BLOCK [FIGURES 60, 61] <br /> X 4. - Viz. <br /> SHED: STAPLED INTERIOR VAPOR BARRIER [FIGURE 62] <br /> Report Date: March 28, 2021 Page 25 of 44 <br /> Site Visit Date: March 6, 2021 Taylor& Syfan Consulting Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.