Laserfiche WebLink
Onsite Permit 555-20-008461-PRMT-01 Page 3 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555043859752 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 4 22/29 `#s`R " `: �' � i f Expiration datef 4/22/22 <br /> b{y4. 't+ +1d:�•}A�((, •'�rr,,..33..'k�y.se' " , t P# � .: ' y " e -'u- .d.> + S * .;k?"` , yx' ''r .�' ti�-,dam. ` <br /> . - :. ,REP,e RE;a '"��tA?nib' �"24•i�hF�<;�� � � ' � -v'` -� �{� r '-aY �a+A a STs..,! n•* t>.We sv r�,•ti w i3�'�i`':. r;F Y Y+ar�•. <br /> WorkJdescriptioin- FIRE-MIN PLACE'*3 BDRM,SFD <br /> F'S,.n y a �: e,� a r: ,.0 .r^- w � i:wt t •s, �s Xis e..a 4t r a'ur. :., <br /> :.3+".� _.:'�*:_r;'+f"Y".a.3._'=�'i� 't�'S,r i�.�'.a-:a. _r,,�. �s...cd�._?:i;iL,r im�'.c.u"�_ 3,.. =,..++�. ...... .a.•�L .3::_ -�.., s._ aw:t4a�u.._ _i:.. ,_ 4 _t .:. .. ,f�"....,,+-.._ ,...,. <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received before <br /> the permit expiration date.Reinstatement of a permit may be granted if an application for permit reinstatement <br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another <br /> person may be granted if an application for permit transfer is received before the permit expiration date and no <br /> other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil. No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not <br /> install system when soil moisture, high groundwater,adverse weather,or other conditions that could affect the <br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier.Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the.inspection has been waived*or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials,or <br /> other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or other <br /> material approved by the agent is completely covering all drain media where required prior to backfill.The <br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been <br /> issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt or <br /> concrete,filling,cutting,or other soil modifications. <br /> Robert G...wi Onsite Wastewater Specialist 2 4/22/21 <br /> / , 51® q 10 Cly <br /> 4/22/21:11:30:54AM Page 3 of 3 ONS_OnsitePermitpr <br />