Onsite Permit 555-20-008461-PRMT-01 Page 3 of 3
<br /> Schedule or track inspections at www.buildingpermits.oregon.gov
<br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555043859752
<br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store
<br /> Date issued 4 22/29 `#s`R " `: �' � i f Expiration datef 4/22/22
<br /> b{y4. 't+ +1d:�•}A�((, •'�rr,,..33..'k�y.se' " , t P# � .: ' y " e -'u- .d.> + S * .;k?"` , yx' ''r .�' ti�-,dam. `
<br /> . - :. ,REP,e RE;a '"��tA?nib' �"24•i�hF�<;�� � � ' � -v'` -� �{� r '-aY �a+A a STs..,! n•* t>.We sv r�,•ti w i3�'�i`':. r;F Y Y+ar�•.
<br /> WorkJdescriptioin- FIRE-MIN PLACE'*3 BDRM,SFD
<br /> F'S,.n y a �: e,� a r: ,.0 .r^- w � i:wt t •s, �s Xis e..a 4t r a'ur. :.,
<br /> :.3+".� _.:'�*:_r;'+f"Y".a.3._'=�'i� 't�'S,r i�.�'.a-:a. _r,,�. �s...cd�._?:i;iL,r im�'.c.u"�_ 3,.. =,..++�. ...... .a.•�L .3::_ -�.., s._ aw:t4a�u.._ _i:.. ,_ 4 _t .:. .. ,f�"....,,+-.._ ,...,.
<br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system
<br /> specified above.
<br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at:
<br /> http://www.deq.state.or.us/wq/onsite/onsite.htm
<br /> General Conditions And Requirements For All Permits:
<br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is
<br /> noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received before
<br /> the permit expiration date.Reinstatement of a permit may be granted if an application for permit reinstatement
<br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another
<br /> person may be granted if an application for permit transfer is received before the permit expiration date and no
<br /> other changes to the permit are necessary.
<br /> Installation Requirements:The drainfield must be installed in undisturbed native soil. No alterations of the
<br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas
<br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not
<br /> install system when soil moisture, high groundwater,adverse weather,or other conditions that could affect the
<br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need
<br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in
<br /> 340-071-0160(9).
<br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when
<br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the
<br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the
<br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection
<br /> and authorizes the system to be backfilled earlier.Receipt and acceptance of a completed Final Inspection
<br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final
<br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received
<br /> before a Certificate of Satisfactory Completion can be issued.
<br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting
<br /> agent has approved the construction installation,*or the.inspection has been waived*or the Certificate of
<br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been
<br /> conducted within 7 days of notification of completed installation).
<br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after
<br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The
<br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials,or
<br /> other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or other
<br /> material approved by the agent is completely covering all drain media where required prior to backfill.The
<br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been
<br /> issued.
<br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated
<br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt or
<br /> concrete,filling,cutting,or other soil modifications.
<br /> Robert G...wi Onsite Wastewater Specialist 2 4/22/21
<br /> / , 51® q 10 Cly
<br /> 4/22/21:11:30:54AM Page 3 of 3 ONS_OnsitePermitpr
<br />
|