Laserfiche WebLink
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own <br />elsewhere. State law requires that the county notify property owners within a certain distance from this property. The proposal and <br />address of the property is described in the "Application" section below. The decision in this case does not directly affect the zoning or <br />use of your property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the staff person listed <br />at the end of this report. <br /> <br />NOTICE OF DECISION <br />PROPERTY LINE ADJUSTMENT CASE NO. 26-004 <br /> <br />APPLICATION: Application of Jefferson Mobile Park LLC and Jefferson Baptist Church for a property line adjustment <br />to adjust the property lines on a 23.1-acre parcel and a 7.7-acre parcel to create an 8.0-acre parcel and a 22.8-acre parcel in <br />an AR (Acreage Residential) zone located at 14822 and 15002 Jefferson Highway SE, Jefferson (T9S; R3W; Section 36C, <br />Tax lot 800 & 900). <br /> <br />DECISION: The Planning Director for Marion County has APPROVED the above-listed Property Line Adjustment <br />application subject to certain conditions. <br /> <br />EXPIRATION DATE: Title transfer instruments accomplishing the property adjustments shall be recorded by the <br />applicants with the Marion County Clerk by March 13th, 2028 (two years). The effective period may be extended for an <br />additional year subject to approval of an extension (form available from the Planning Division). Additional extensions <br />may not be granted if the regulations under which this decision was granted have changed since the original <br />approval. <br /> <br />WARNING: A decision approving the proposal is for land use purposes only. Due to septic, well and drainfield <br />replacement areas, this parcel may not be able to support the propos al. To be sure the subject property can accommodate <br />the proposal the applicant should contact the Building Inspection Division, (503) 588-5147. <br /> <br />This decision does not include approval of a building permit. <br /> <br />CONDITIONS: The following conditions must be met before a building permit can be obtained or the approved use <br />established: <br /> <br />1. Property line adjustment deed(s) shall be recorded with the Marion County Clerk’s Office. Per ORS 92.190 (4) <br />AFTER THE PLAT. A re-plat (in the form of a partition plat) is required, due to the adjustment or elimination of <br />a partition plat parcel line or subdivision lot line. Re-plat: (Re-configuration of lots or parcels and public <br />easements within a recorded plat). Must be platted per ORS 92.050/055, and the plat submitted for review. <br />Checking fee and recording fees required. A current or updated title report must be submitted at the time of <br />review. <br /> <br />2. The property line shall be located such that all structures meet the required 20-foot minimum front and rear yard <br />setbacks and 10 foot minimum for side yards. <br /> <br />3. Prior to recording the deeds, the applicants shall obtain any septic review and/or evaluations that may be required <br />from the Marion County Building Inspection Division. <br /> <br />4. Septic Conditions of Approval: 14822 Jefferson Hwy 99E SE, Jefferson – The existing septic systems will need <br />to be located, and Existing System Evaluation Reports submitted to Building Inspection. A Site Evaluation will <br />be required for the future septic replacement area for the mobile home park. <br /> <br />5. The resulting parcels shall significantly conform to the site plan submitted with the proposal. Minor variations are <br />permitted upon review and approval by the Planning Director. <br /> <br />ADDITIONAL CONDITIONS: Once the approved use is established the following conditions must be continually <br />satisfied: <br /> <br />6. After the property line adjustment has been completed, no alteration of property lines shall be permitted without <br />first obtaining approval from the Planning Director.