Laserfiche WebLink
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own <br />elsewhere. State law requires that the county notify property owners within a certain distance from this property. The proposal and <br />address of the property is described in the "Application" section below. The decision in this case does not directly affect the zoning or <br />use of your property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the staff person listed <br />at the end of this report. <br /> <br />NOTICE OF DECISION <br />CONDITIONAL USE CASE NO. 25-051 <br /> <br />APPLICATION: Application of Jesus Perez Rios for a conditional use permit to operate a farm labor contracting <br />business as a commercial activity in conjunction with farm use on a 2.10-acre parcel in an EFU (Exclusive Farm Use) <br />zone located at 7683 Sunnyview Rd NE, Salem (T7S; R2W; Section 14CC; Tax lot 300). <br /> <br /> DECISION: The Planning Director for Marion County has APPROVED the above-described Conditional Use applica- <br />tion subject to certain conditions. <br /> <br />EXPIRATION DATE: This conditional use permit is valid only when exercised by January 29th, 2028. The effective <br />period may be extended for an additional year subject to approval of an extension (form available from the Planning <br />Division). Additional extensions may not be granted if the regulations under which this decision was granted have <br />changed since the original approval. <br /> <br />WARNING: A decision approving the proposal is for land use purposes only. Due to septic, well, and drain field <br />replacement areas, these parcels may not be able to support the proposal. To be sure the subject property can <br />accommodate the proposed use the applicant should contact the Building Inspection Division, (503) 588-5147. <br /> <br />This decision does not include approval of a building permit. <br /> <br />CONDITIONS: The following conditions must be met before a building permit can be obtained or the approved use <br />established: <br /> <br />1. The applicant shall obtain all required permits from the Marion County Building Inspection Division. This <br />includes any permits required by Marion County Septic. <br /> <br />2. Per Marion County Septic; An authorization is required due to the change of use. The applicants shall obtain this <br />required authorization. <br /> <br />3. The applicant shall sign and submit a Farm/Forest Declaratory Statement (form enclosed) to the Planning <br />Division. This statement shall be recorded by the applicant with the Marion County Clerk after it has been <br />reviewed and signed by the Planning Director. <br /> <br />ADDITIONAL CONDITIONS: Once the approved use is established the following conditions must be continually <br />satisfied: <br /> <br />4. The development shall significantly conform to the site plan submitted with the proposal. Minor variations are <br />permitted upon review and approval of the Planning Director. <br /> <br />5. The portable toilets shall be continuously maintained to the standards of Marion County Septic. See agency <br />comments found under Finding #6 for specific reference, and the applicant is advised to reach out to Marion <br />County Septic for further information. <br /> <br />6. Failure to continuously comply with the conditions of approval may result in this approval being revoked. Any <br />revocation could be appealed to the county hearings officer for a public hearing. <br /> <br />OTHER PERMITS, FEES, AND RESTRICTIONS: This approval does not remove or affect covenants or restrictions <br />imposed on the subject property by deed or other instrument. The proposed use may require permits and/or fees from <br />other local, State or Federal agencies. This decision does not take the place of, or relieve the responsibility for, obtaining