My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CU25-027 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
2025
>
Conditional Use
>
CU25-027 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 12:34:48 PM
Creation date
7/31/2025 12:35:13 PM
Metadata
Fields
Template:
Land Use
Case_Number
25-027
Document_Date
7/31/2025
Land Use Type
Conditional Use
Tax_Lot_Number
092W29A002200
Document_Type
Decision
Site_Address
13299 MORROW LN SE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own <br />elsewhere. State law requires that the county notify property owners within a certain distance from this property. The proposal and <br />address of the property is described in the "Application" section below. The decision in this case does not directly affect the zoning or <br />use of your property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the staff person listed <br />at the end of this report. <br /> <br />NOTICE OF DECISION <br />CONDITIONAL USE CASE NO. 25-027 <br /> <br />APPLICATION: Application of Vickie and Al Rhodes for a conditional use permit to change the occupant of a <br />temporary medical hardship dwelling on a 2.42-acre parcel in an AR (Acreage Residential) zone located at 13299 Morrow <br />LN SE, Turner (T9S; R2W; Section 29A; Tax lot 2200). <br /> <br />DECISION: The Planning Director for Marion County has APPROVED the above-described Conditional Use applica- <br />tion subject to conditions. <br /> <br />EXPIRATION DATE: This conditional use permit is valid only when exercised by August 15th, 2027. The effective <br />period may be extended for an additional year subject to approval of an extension (form available from the Planning <br />Division). Additional extensions may not be granted if the regulations under which this decision was granted have <br />changed since the original approval. <br /> <br />RENEWAL: This permit may be renewed for successive one year periods if the applicant submits to the Planning <br />Division, on an annual basis, a new Physician's Certificate which indicates that the hardship situation continues. <br />The Planning Division will mail renewal forms to the property owner approximately two months prior to permit <br />expiration. <br /> <br />CONDITIONS: Once the approved use is established the following conditions must be continually satisfied: <br /> <br />1. All conditions of approval listed in CU16-029 shall remain in effect. <br /> <br />2. The applicants are advised that this permit is granted for a period of one year and must be renewed for succes- <br />sive one year periods upon submittal of a Physician's Certificate verifying that the hardship conditions continue <br />to exist. In addition, every five years the Marion County Building Inspection Division requires a septic evaluation <br />for shared septic systems prior to renewal of hardship conditional uses. <br /> <br />3. The applicant is advised that the Manufactured Dwelling/RV Disconnect Agreement, which specifies that <br />placement of the manufactured dwelling or RV is temporary and that it will be removed/disconnected after the <br />hardship ceases, as required in CU16-029, remains in effect. <br /> <br />4. The applicant shall obtain any required septic permits for authorization of the change in hardship as required by <br />Marion County Septic. <br /> <br />OTHER PERMITS, FEES AND RESTRICTIONS: This approval does not remove or affect covenants or restrictions <br />imposed on the subject property by deed or other instrument. The proposed use may require permits and/or fees from other <br />local, state or federal agencies. This decision does not take the place of, or relieve the responsibility for , obtaining other <br />permits or satisfying restrictions or conditions thereon. It is recommended that the agencies mentioned in Finding #5 below <br />be contacted to identify restrictions or necessary permits. The applicant is advised of the following: <br /> <br />5. The applicants should contact the Jefferson Fire District to obtain a copy of the District’s Recommended Building <br />Access and Premise Identification regulations and the Marion County Fire Code Applications Guide. Fire District <br />access standards may be more restrictive than County standards. <br /> <br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regula- <br />tions the Director must condition or deny the application. Anyone who disagrees with the Director's decision may request <br />that the application be considered by a Marion County hearings officer after a public hearing. The applicant may also <br />request reconsideration (one time only and a fee of $200) on the basis of new information subject to signing an extension <br />of the 150 day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Requests for reconsideration, or <br />consideration by a hearings officer, must be in writing (form available from the Planning Division) and received in the <br />Marion County Planning Division, 5155 Silverton Rd. NE, Salem, by 5:00 p.m. on August 15th, 2025. If you have
The URL can be used to link to this page
Your browser does not support the video tag.