Laserfiche WebLink
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own <br />elsewhere. State law requires that the county notify property owners within a certain distance from this property. The proposal and <br />address of the property is described in the "Application" section below. The decision in this case does not directly affect the zoning or <br />use of your property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the staff person listed <br />at the end of this report. <br /> <br />NOTICE OF DECISION <br />PARTITION CASE NO. 25-011 <br /> <br />APPLICATION: Application of Olivo and Herlinda Ceja to partition a 4.61-acre parcel into two parcels of 2.06-acres <br />and 2.55-acres in an AR (Acreage Residential) zone located at 372 Hampden Ln NE, Salem (T7S; R2W; Section 28BC; <br />Tax lot 1000). <br /> <br />DECISION: The Planning Director for Marion County has APPROVED the above-described Partition application <br />subject to certain conditions. <br /> <br />EXPIRATION DATE: This approval is valid only when the final partition plat is recorded by June 4th, 2027. The <br />effective period may be extended for an additional year subject to approval of an extension (form available from the <br />Planning Division). Additional extensions may not be granted if the regulations under which this decision was <br />granted have changed since the original approval. <br /> <br />WARNING: A decision approving the proposed division is for land use purposes only. Due to septic, well, and drain <br />field replacement areas, these parcels may not be able to support a dwelling. To be sure the subject property can <br />accommodate the proposed use the applicant should contact the Building Inspection Division, (503) 588-5147. <br /> <br />This decision does not include approval of a building permit. <br /> <br />CONDITIONS: The following conditions must be met before a building permit can be obtained or the approved use <br />established: <br /> <br />Prior to recording the final plat: <br /> <br />l. Per the Marion County Surveyor’s Office; The parcels must be surveyed and monumented. Per ORS 92.050, the <br />plat must be submitted for review. Checking and recording fees are required. Finally, a current or updated title <br />report must be submitted at the time of review. Title reports shall be no more than 15 days old at the time of <br />approval of the plat by the Surveyor’s Office, which may require additional updated reports. <br /> <br />2. The applicant shall obtain all permits required by Marion County Building, including any septic evaluations. <br /> <br />3. The new parcel identified on the applicant’s site plan as Parcel 1 shall be addressed 372 Hampden Ln NE. The <br />new parcel identified as Parcel 2 on the applicant’s site plan shall be addressed 362 Hampden Ln NE. <br /> <br />4. Each of the resultant parcels shall have only one single family dwelling. <br /> <br />5. Public Works Land Development Engineering and Permits Division (LDEP) will not approve the final plat for <br />recordation until the following conditions have been satisfied: <br /> <br />ENGINEERING CONDITIONS <br /> <br />Condition A – On the partition plat dedicate a 30-foot Right-of-Way half-width for public roadway purposes to <br />meet the county Local road standard. <br /> <br />Condition B – Prior to partition plat approval, under an Access Permit widen the shared access driveway <br />approach to accommodate safe passage of two-way traffic. <br /> <br />Condition C – Depict an appropriate access and utility easement(s) on the partition plat.