My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CU25-018 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
2025
>
Conditional Use
>
CU25-018 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 1:00:30 PM
Creation date
5/2/2025 1:00:47 PM
Metadata
Fields
Template:
Land Use
Case_Number
25-018
Document_Date
5/2/2025
Land Use Type
Conditional Use
Tax_Lot_Number
042W190000500
Document_Type
Decision
Site_Address
19750 RIVER RD NE ST PAUL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own <br />elsewhere. State law requires that the county notify property owners within a certain distance from this property. The proposal and <br />address of the property is described in the "Application" section below. The decision in this case does not directly affect the zoning or <br />use of your property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the staff person listed <br />at the end of this report. <br /> <br />NOTICE OF DECISION <br />CONDITIONAL USE CASE NO. 25-018 <br /> <br />APPLICATION: Application of Coleman Farms Inc. and Fairfield Farms Inc. for a temporary use permit to authorize <br />single-day parking once a year for five days on a 139.60-acre parcel in an EFU (Exclusive Farm Use) zone located at <br />19751 River Rd NE, Saint Paul (T4S; R2W; Section 19; Tax lot 500). <br /> <br />DECISION: The Planning Director for Marion County has APPROVED the above-described Conditional Use applica- <br />tion subject to certain conditions. PLEASE READ ALL CONDITIONS. <br /> <br />EXPIRATION DATE: This conditional use permit is valid only when exercised by May 19th, 2027. The effective period <br />may be extended for an additional year subject to approval of an extension (form available from the Planning Division). <br />Additional extensions may not be granted if the regulations under which this decision was granted have changed <br />since the original approval. <br /> <br />WARNING: A decision approving the proposal is for land use purposes only. Due to septic, well, and drain field <br />replacement areas, these parcels may not be able to support the proposal. To be sure the subject property can <br />accommodate the proposed use the applicant should contact the Building Inspection Division, (503) 588-5147. <br /> <br />This decision does not include approval of a building permit. <br /> <br />CONDITIONS: The following conditions must be met before a building permit can be obtained or the approved use <br />established: <br /> <br />1. The applicant shall obtain any required permits from the Marion County Public Works. <br /> <br />2. The applicant shall sign and submit a Declaratory Statement (form enclosed) to the Planning Division. This <br />statement shall be recorded by the applicant with the Marion County Clerk after it has been reviewed and signed <br />by the Planning Director. <br /> <br />3. The parking shall only be permitted for the five days in conjunction with the St. Paul Rodeo. <br /> <br />4. The operator of the temporary use shall sign an agreement with the planning division regarding termination of the <br />use consistent with the time limitations established in the conditions of approval. <br /> <br />5. No amplified sound shall be used in conjunction with the parking. <br /> <br />6. Trash and other materials generated by the car parking shall be contained entirely on the subject property. <br /> <br />7. Lighting used on the subject property shall be directed to the interior of the subject property so as to not create <br />glare or light pollution onto surrounding residential properties. <br /> <br />8. Public Works Land Development Engineering and Permits Division (LDEP) will not approve the use until the <br />following conditions have been satisfied: <br /> <br />Condition A – Prior to the 2025 City of St Paul rodeo event, provide evidence of a MCPW Engineering permit for <br />the paved River Road access approach, or, obtain a post-construction access permit for administrative <br />documentation and field inspection of same. <br />
The URL can be used to link to this page
Your browser does not support the video tag.