Laserfiche WebLink
Onsite Permit 555-17-008852-PRMT Page 2 of 3 <br /> Schedule Inspections online at www buildingpermlb.oregon.gov or by calling: 1-888-299-2821 or 541-388-6575 <br /> When calling for an Inspection,use IVR Number:555018938381 <br /> @' W1 C'e i {5 e5 f a <br /> . trrri <br /> vF ' <br /> Groundwater Interceptor Drain Media Amt: N/A <br /> Pump to Drainfield Reqd: N/A Filter Fabric on Top of Drain Media: N/A <br /> Rake Trench Sidewalls: N/A <br /> Other Special Rgmb Not specified <br /> Conditions of Approval <br /> The septic tank installation plan is approved as submitted. Please refer to the signed approved site plan dated November 16, <br /> 2017. Any deviation from the approved plans must be authorized by this office prior to installation or the permit may be voided. <br /> TANK RISER: The tank must be installed with watertight risers extending to the ground surface or above. The riser lid must <br /> be gasketed and securely fastened. <br /> EFFLUENT SEWER:The effluent sewer is the pipe from the septic tank to the distribution box. The material required is 3034 <br /> or Schedule 40 pipe with 18-gauge minimum green tracer'wire or green metallic tape placed along the pipe. The effluent <br /> sewer shall extend at least five(5)feet from the tank. There must be a minimum difference of eight(8)inches between the <br /> invert(flow line)of the septic tank outlet and the invert of the distribution or drop box outlet. In Equal Distribution,there must <br /> be six(6)inches of fall between the septic tank outlet and the distribution box inlet. In Serial Distribution,there must be two(2) <br /> inches of fall between the septic tank outlet and the drop box inlet. <br /> OBSERVE ALL SETBACKS AND SEPARATION DISTANCES as required by the Department of Environmental Quality rules. <br /> A copy of the DEQ setback requirements is available in our office and online at <br /> http://wlw+.oregon.gov/deq/ResidentiaVPages/Onsite.aspxunder Rules: Division 71:Table 1. <br /> THE ATTACHED SEPTIC TANK ABANDONMENT FORM MUST BE COMPLETED AND RETURNED TO OUR OFFICE. <br /> The septic system installer must complete and sign the form and attach a copy of the receipt from the septic tank pumping <br /> service for pumping the tank. <br /> MAINTAIN PERMANENT ACCESSIc septic tank for pumping and service. The septic tank should be pumped and <br /> inspected by a licensed septic tank service before sludge and scum accumulations reach 30%of the tank liquid <br /> operating volume. Pumping every 3 to 5 years is an average interval. The septic tank is a reservoir for the solid materials <br /> in the sewage waste stream. Excessive accumulation of these solid materials in the septic tank will cause the solids to wash <br /> out of the tank and into the drainfield. This will cause irreversible damage to the drainfield and will eventually lead to a system <br /> failure. <br /> THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTEDfrom any vehicular traffic or other sources of soil <br /> compaction. Activities such as excavating or filling,driveway placement,paving or any similar alteration of the natural soil <br /> conditions will adversely affect septic system function and lead to premature system failure. The area must not be subjected to <br /> excessive saturation due to artificial drainage of ground surfaces,driveways, building downspouts or other sources. The areas <br /> of the initial septic system and the future repair system must both be protected. <br /> CALL BEFORE YOU DIGITS THE LAW <br /> adapted by the pniay Nonnra.m anter. mm. by Oregon Ade...eater ere.. net may ole.ropes <br /> or the rule.by vIN the center.motw:nee eephane number for the Oregon unity Notification renter a t.BOO v2 net) <br /> 11/17/17:8:56:33AM Page 2 of 3 C:\myReports/reports//production/01 STANDARD <br /> REPORTS/st OnsicePermiLv2_pr.rpt <br />