Laserfiche WebLink
Onsite Permit 555-17-007615-PRMT Page 3 of 3 <br /> Schedule Inspections online at www.buildingpermits.oregon.gov or by calling: 1-888-299-2821 or 541388-6575 <br /> When calling for an inspection,use IVR Number:555092295823 <br /> bate Issus ID/1G/176/0 ! Exp +t,i B <br /> Work uesvlpHan:,; MINOR REPAIR r.iik � GT��Id�Nah1�. - <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing; and Database of licensed Installers can be accessed at: <br /> httP://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date <br /> is noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received <br /> before the permit expiration date. Reinstatement of a permit may be granted if an application for permit <br /> reinstatement Is received within one year after the permit expiration date. Transfer of a permit from the <br /> permittee to another person may be granted if an application for permit transfer is received before the permit <br /> expiration date and no other changes to the permit are necessary. <br /> Installation Requirements: The drainfield must be installed in undisturbed native soil. No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval <br /> areas for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent. Do <br /> not install system when soil moisture, high groundwater, adverse weather, or other conditions that could <br /> affect the quality of installation or reliability of the system are present. If such conditions are present and <br /> there is a need for sewage disposal at the site, the septic tank can be utilized as a temporary holding tank as <br /> outlined in 340-071-0160(9). <br /> Inspection Requirements: The system installer and/or the permit holder must notify the permitting Agent <br /> when the construction, alteration,or repair of a system for which a permit was issued is completed (except for <br /> the backfilling or covering of the installation). The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the <br /> inspection and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final <br /> Inspection Request and Notice form by the permitting agent establishes the official notice date of your request <br /> for the final inspection. Faxed copies are acceptable for inspection request purposes only. Originals must be <br /> received before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements: The system is to be backfilled or covered as follows: <br /> *Only after the permitting agent has approved the construction installation, <br /> *or the inspection has been waived <br /> *or the Certificate of Satisfactory Completion (CSC) has been issued by operation of law (where the <br /> inspection has not been conducted within 7 days of notification of completed installation). <br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones, frozen clumps of earth, masonry,stumps, waste construction materials, <br /> or other materials that could damage the system. Be sure that the untreated building paper,filter fabric,or <br /> other material approved by the agent is completely covering all drain media where required prior to backfill. <br /> The system can be connected to and placed into service once it has been properly backfilled and the CSC has <br /> been issued. <br /> Initial and Replacement Areas — Protection: The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways, covering with asphalt <br /> or concrete,filling,cutting,or other soil modifications. <br /> Matthew Puntney 10/16/17 <br /> CALL BEFORE YOU DIG...IT'S The LAW <br /> the anon by Oregon Adm,n¢tnenn emex. You may attain topes <br /> dl the mlex dy om the renter.(Norte me telephone nomneyr lw me OregOn muhy uol mmtcoCenter a t-0oo-)32-2744 <br /> 10/16/17: 1:45.46PM Page 3 of 3 C:\myReports/reports//production/01 STANDARD <br /> REPORTS/stdOnsltepermlt_v2_pr.rpt <br />