My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9083506
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
17-XXXXXX
>
9083506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:33:41 PM
Creation date
1/2/2020 4:52:09 PM
Metadata
Fields
Template:
Permits
Permit Address
22015 CAMELLIA AVE NE
Permit City
AURORA
Permit Number
555-17-007615-PRMT
Parcel Number
041W11BD03500
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"c!.. Marion County <br /> OREGON <br /> PUBLIC WORKS <br /> (503)588-5036 December 23, 2019 <br /> BOARD OF Roclo Sixtos <br /> COMMISSIONERS 22015 Camellia Ave NE <br /> Kevin Cameron Aurora OR, 97002 <br /> 5am Brentano <br /> corm Willis RE:Permit 555-17-007615 <br /> DIRECTOR Dear Mr Sixtos <br /> Brian Nicholas,P.E. <br /> ADMINISTRATION On October 16, 2017, a minor repair installation permit 555-17-007615 <br /> was issued for the installation of a replacement septic tank to serve the <br /> BUILDING home located at the above mentioned address. An inspection was done <br /> INSPECTION on 10/27/17, by Matt Puntney and the septic tank installation was <br /> approved, however a signed asbuilt document was never submitted to this <br /> EMERGENCY office. An asbuilt document signed by the licensed and certified septic <br /> MANAGEMENT installer that has installed the system or the homeowner that has installed <br /> ENGINEERING the septic system is required before a Certificate of Satisfactory <br /> Completion can be issued by this office. A signed tank abandonment form <br /> ENVIRONMENTAL with a tank pump receipt is also required as well. <br /> SERVICES <br /> Per OAR 340-071-0175(6), A person may not connect to or use any <br /> OPERATIONS system completed after January 1, 1974, unless a Certificate of <br /> PARKS Satisfactory Completion has been issued for the installation or deemed <br /> issued by operation of law in accordance with this rule. <br /> PLANNING <br /> Per OAR 340-071-160(5), Permit effective dates, A permit issued for <br /> SURVEY construction of a system under this rule is effective for one year from the <br /> date of issuance. This permit has now expired. <br /> In order to issue a Certification of Satisfactory Completion for this system, <br /> a new permit application must be submitted with associated fees and <br /> documentation, a signed asbuilt document and drawing will also need to <br /> be submitted and a site visit and inspection may be required if deemed to <br /> be necessary in order to final the installation. <br /> 5155 Silverton Road NE•Salem,OR 97305-3802• www.co.marion.or.us/PW <br /> Printed on recycled paper• Reduce—Reuse—Recycle-Recover <br />
The URL can be used to link to this page
Your browser does not support the video tag.