Laserfiche WebLink
Onsite Permit 555-17-005317-PRMT Page 3 of 4 <br /> Schedule Inspections online at www.buildingpermiK.oregon.goo or by calling'. 1-888-299-2821 or 541-388-6575 <br /> When calling for an inspection,use IVR Number:555088764100 <br /> tlR 1 ' 17 fflfiT ii t 92 � rffi F"t*n* r., ,'.1 <br /> Descr . e . , § Rrc IR i'.N1 �a6 I 5l dire,amu aii '4 .r. t,.. . <br /> ' hey nfdE4:V INSTALL: AGER B 1 a ". u <br /> Conditions of Approval <br /> • This property has been approved for a STANDARD SEPTIC SYSTEM in the area identified in Site Evaluation <br /> Report 555-17-002213-EVAL. System plans are approved as submitted. Refer to approved plans dated July <br /> 27, 2017. Any deviation from the approved plans must be authorized by this office prior to installation or the <br /> permit may be voided. It's the responsibility of applicant/installer to coordinate these requirements with all <br /> others in OAR 340-071-0220. <br /> • This permit is for a system designed to serve a commercial facility with up to 10 employees. Peak sewage <br /> flow into the system is limited to a maximum of 150 gallons per day,with an average sewage flow of not <br /> mare than 75 gallons per day. Premature failure of the treatment system may occur if either of these flow <br /> quantities is exceeded. If, for some reason,you expect your domestic household water use may exceed these <br /> flows, it is advisable to increase the size of the treatment system. <br /> • EFFLUENT SEWER: The effluent sewer is the pipe from the septic tank to the distribution box. The <br /> material required is 3034 or Schedule 40 pipe with 18-gauge minimum green tracer wire or green metallic <br /> tape placed along the pipe. The effluent sewer shall extend at least five(5)feet from the tank. There must <br /> be a minimum difference of eight(8) inches between the invert(flaw line) of the septic tank outlet and the <br /> invert of the distribution or drop box outlet. In Equal Distribution,there must be six (6) inches of fall between <br /> the septic tank outlet and the distribution box inlet. In Serial Distribution, there must be two(2) inches of fall <br /> between the septic tank outlet and the drop box inlet. <br /> • HEADERRIPE between Distribution Box and drainfield trench must measure a minimum of 4 feet, must be <br /> installed level, and bedded on undisturbed earth. <br /> • AN EFFLUENT FILTER IS REQUIRED on all tanks serving a commercial facility. <br /> • TANK RISER: The tank must be installed with watertight risers extending to the ground surface or above. <br /> The riser lid must be gasketed and securely fastened. <br /> • OBSERVE ALL SETBACKS AND SEPARATION DISTANCES as required by the DEQ rules. A copy of the DEQ <br /> setback requirements is on file in our office and available online at <br /> http://www.deq.state.or.us/wq/onsite/sdssearch.asp under Rules: Division 71: Table 1. <br /> • MAINTAIN PERMANENT ACCESS to septic tank far pumping and service.The septic tank should be <br /> pumped and inspected by a licensed septic tank pumping service before sludge and scum accumulations reach. <br /> 30%of the tank liquid operating volume. Pumping every 3 to 5 years is an average interval. The septic tank <br /> is a reservoir for the solid materials in the sewage waste stream. Excessive accumulation of these solid <br /> materials in the septic tank will cause the solids to wash out of the tank and into the drainfield. This will <br /> cause irreversible damage to the drainfield and will eventually lead to a system failure. <br /> • THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTED from any vehicular traffic, livestock and <br /> farming activities. Other activities such as excavating or filling, driveway placement, paving or other similar <br /> activities that alter the natural soil conditions will adversely affect the soil and the septic system function and <br /> lead to premature system failure. The area must not be subjected to excessive saturation due to artificial <br /> drainage of ground surfaces, driveways, building downspouts or other sources. The areas of the initial septic <br /> system and the future repair system must both be protected. <br /> THIS SYSTEM MUST BE INSPECTED AND APPROVED PRIOR TO BACKFILL. When work is complete and ready for <br /> inspection, request an inspection by following the instructions on the accompanying permit document. Be sure the System <br /> Record form with the As-Built drawing is on the job or in our office when the inspection is requested. An inspection should be <br /> completed within seven(7)days. <br /> CALL BEFORE You DIG...IT'S THE LAW <br /> ATTENTION Oregon by(motives you to follow Ades red by the Oregon utility Nounrnnn Center Those by Oregon Administration nubammay Osten copies <br /> of the rules by calloig the renter(NoteThe telephone number for Oregon utility Nota ton Center is t 400.3322344.1 <br /> 8/17/17'. 3:35:58PM Page 3 of 4 C:\mygeports/reports//production/01 STANDARD <br /> REPORTS/std OnsitePermit_v2_pr.rpt <br />