My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9080392
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
18-XXXXXX
>
9080392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:13:54 AM
Creation date
12/27/2019 4:29:54 PM
Metadata
Fields
Template:
Permits
Permit Address
7294 ELMERS CT NE; 7112 ELMERS CT NE
Permit City
SILVERTON
Permit Number
555-18-003905-PRMT
Parcel Number
061E20C 04400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pipe. The gravel must be covered with filter fabric. When curtain drain outlet piping is covered by less <br /> than 12 inches of soil,pipe must meet or exceed ASTM Standard D-3034. The outlet must be fitted with <br /> a flap gate or rodent guard. The curtain drain must be located at least 10 feet up slope from the disposal <br /> field and must discharge through a watertight non-perforated pipe beside or below the disposal field. A <br /> minimum separation of 10 feet is required from the septic tank if the tank is located up slope of the <br /> curtain drain and 5 feet if the tank is located down slope of the curtain drain. <br /> A CAPPING FILL DRAINFIELD IS REQUIRED in conjunction with the attached septic system <br /> approval. CAPPING FILL systems are installed in soils where a layer that limits the effective soil depth <br /> or a water table is present in the soil profile at a depth shallower than allowed for a standard system.The <br /> DISPOSAL TRENCHES are installed at a VERY SHALLOW DEPTH and APPROVED FILL is placed <br /> over the trenches to provide earth cover over the system. Fill material must be evenly graded over the <br /> DRAINFIELD and crowned at the center to shed rainfall.CAPPING FILL SYSTEMS MAY ONLY BE <br /> INSTALLED FROM JUNE 1 AND OCTOBER I or during such times when the Building Inspection <br /> Onsite Wastewater staff finds soil moisture conditions acceptable. See the attached"CAPPING FILL" <br /> information sheet for instructions. NOTE: GRA VELLESS ABSORPTION TRENCHES MAY BE <br /> INSTALLED IN LIEU of the CAPPING FILL DRAINFIELD. <br /> A DETAILED SEPTIC SYSTEM STAKEOUT IS REQUIRED prior to the issuance of a septic system <br /> installation permit. The area for the system is very limited and the stakeout must be completed to • <br /> determine that the system will fit within the area of the approved test pits. A scale drawn, detailed site <br /> plan must b submitted with the application for the installation permit.The stakeout must be inspected on <br /> the property and approved before the permit can be issued.Instructions for the stakeout are attached and <br /> are available in our office. <br /> Additional Conditions of Site Approval <br /> 1. This site is approved for the type of disposal system described above. Peak sewage flow into the <br /> system is limited to a maximum of 450 gallons per day, with an average sewage flow of not more <br /> than 225 gallons per day. This is normally sufficient to serve a single family dwelling with a <br /> maximum of four bedrooms. Premature failure of the treatment system may occur if either of these <br /> flow quantities is exceeded. Iffor some reason you expect your domestic household water use may <br /> exceed these flows, it may be advisable to increase the size of the treatment system. <br /> 2. Any alteration of natural soil conditions(i.e. cutting or filling) in the acceptable area may void this <br /> approval. <br /> 3. Both the initial and replacement disposal areas are to be protected from traffic,livestock and farming <br /> activities, development or other potential disturbance of natural soil conditions. <br /> 4. The area must not be subjected to excessive saturation due to,but not limited to, artificial drainage <br /> of ground surfaces, roads, driveways and building down spouts. <br /> 5. This approval is given on the basis that the parcel described above will not be further partitioned or <br /> subdivided. <br /> 6. Placement of a well within 100 feet of the approved areas may invalidate this approval. <br /> This site approval is valid until the system approved above is constructed in accordance with a Marion <br /> 555 Court St NE - P.O.Box 14500-Salem,Oregon 97309-5036-Phone(503)588-5147-Fax(503)588-7948 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.