Laserfiche WebLink
Septic Permit 555-17-008400-PRMT Page 2 of 3 <br /> Wak'fp , ptton - aM�1NALTRomRiEPI'r TANK�rN ATrF ONa TOW�BDC::. QO 6..6c5'._.:_.aw ,' <br /> , r <br /> ' <br /> " r� r:Sr fu. 4� 4 � « � ( r sXe� , +" � # N Exa- cp <br /> . — ; kf 4.4 fi„ ��a� ^#> <br /> 4,4 <br /> _. � . .,.. ..: <br /> `at, ° M1: x � 4 ,r�'� P11,� RP, OfcP!uCOXd{?�4<11 : 4�trkAm . #:Y <br /> �' ,r� �..»..... ..... <br /> MINOR REPAIR SEPTIC TANK REPLACEMENT <br /> The septic tank installation plan is approved as submitted. Please refer to the signed approved site plan dated November 2, <br /> 2017. Any deviation from the approved plans must be authorized by this office prior to installation or the permit may be voided. <br /> ANTIBOUYANCY IS REQUIRED AT THIS LOCATION. Install as per manufacturer's instructions listed on the Oregon DEQ <br /> website. <br /> TANK RISER: The tank must be installed with watertight risers extending to the ground surface or above. The riser lid must be <br /> gasketed and securely fastened. <br /> AN EFFLUENT LIFT PUMPWILL BE REQUIRED to install the septic system disposal field in the approved area and at the <br /> required depth. Detailed instructions for dosing tank/effluent pump installations are available in our office. The electrical wiring <br /> to the pump and alarm must be installed in accordance with the appropriate Electrical Code. The electrical work must be done <br /> under a Marion County Electrical Permit and must be inspected and approved by a Marion County Electrical Inspector. The <br /> work must be left uncovered and accessible for inspection. The electrical inspection includes the connections to the pump and <br /> alarm in the dosing tank,the wiring in the trench and the connections in the structure. <br /> OBSERVE ALL SETBACKS AND SEPARATION DISTANCES as required by the Department of Environmental Quality rules. A <br /> copy of the DEQ setback requirements is available in our office and online at <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspxunder Rules: Division 71:Table 1. <br /> THE ATTACHED SEPTIC TANK ABANDONMENT FORM MUST BE COMPLETED AND RETURNED TO OUR OFFICE. The <br /> septic system installer must complete and sign the form and attach a copy of the receipt from the septic tank pumping service <br /> for pumping the tank. <br /> MAINTAIN PERMANENT ACCESSto septic tank for pumping and service. The septic tank should be pumped and <br /> inspected by a licensed septic tank service before sludge and scum accumulations reach 30%of the tank liquid <br /> operating volume. Pumping every 3 to 5 years is an average interval. The septic tank is a reservoir for the solid materials <br /> in the sewage waste stream. Excessive accumulation of these solid materials in the septic tank will cause the solids to wash out <br /> of the tank and into the drainfield. This will cause irreversible damage to the drainfield and will eventually lead to a system <br /> failure. <br /> THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTEDfrom any vehicular traffic or other sources of soil <br /> compaction. Activities such as excavating or filling, driveway placement, paving or any similar alteration of the natural soil <br /> conditions will adversely affect septic system function and lead to premature system failure. The area must not be subjected to <br /> excessive saturation due to artificial drainage of ground surfaces,driveways,building downspouts or other sources. The areas <br /> of the initial septic system and the future repair system must both be protected. <br /> 6/25/19:11:18:20AM Page 2 of 3 ONS_OnsiteCSC_pr <br />