Laserfiche WebLink
Septic Site Evaluation 555-19-003469-EVAL Page 4 of 5 <br /> Date Issued:061117 .,, f Min �' ,rri� �,' �� g-� „ct�. 4 � "iffy" <br /> 'r �>�-€��is ra i �i, r �r � a'���,r.�+,, � ��� � s�r'"�"�' sem:1-17000-3334f44% <br /> ;.'4` * �9 n v ° 3 n 1 ' ..* - � <br /> ApplicationYstaitus�S`i�E�aluatt+x rApprovedptootmwi,vtfaeAzi,?!,f4z.%*fwmfwrwi, ,,,r, <br /> r 34�' 4� <br /> Work description Sty ;T URE:3 BDRM SED <br /> .......... <br /> sufficient to serve a residence with 4(four)bedrooms. Premature failure of the treatment system may occur if either of <br /> these flow quantities is exceeded. If, for some reason,you expect your water use may exceed these flows, it may be <br /> advisable to increase the size of the treatment system. <br /> 2. Any alteration of natural soil conditions(i.e. cutting, logging,or filling)in the acceptable area may void this approval. <br /> Continued disturbance in the area of the approved test pits is highly discouraged. <br /> 3. Both the initial and replacement disposal areas are to be protected from traffic, livestock and farming activities, <br /> development or other potential disturbance of natural soil conditions. <br /> 4: The area must not be subjected to excessive saturation due to,but not limited to, artificial drainage of ground surfaces, <br /> roads,driveways and building down spouts. <br /> 5. This approval is given on the basis that the parcel described above will not be further partitioned or subdivided. <br /> 6. Placement of a well within 100 feet of the approved areas may invalidate this approval. <br /> This site approval is valid until the system approved above is constructed in accordance with a Marion County issued <br /> Construction-Installation permit. Technical rule changes shall not invalidate this approval, but may require use of a different <br /> kind of system. The site approval runs withthe land and will automatically benefit subsequent owners. <br /> Next Step—Construction-Installation Permit <br /> When you are ready to proceed with system construction, contact our office to get a permit application package. Detailed <br /> plans are required for the system prior to the issuance of the permit. Two sets of plans for the system must be submitted at <br /> the time of application for the installation permit. The permit must be issued by Marion County before you can start <br /> construction. <br /> You can find a list of licensed septic system installers on the DEQ web site <br /> http://www.deq.state.or.us/wq/onsite/sdssearch.asp . Once the plans are submitted they will be reviewed before the <br /> installation permit can be approved and issued. <br /> If you believe that an error was made in the evaluation of your property,you may apply for a Site Evaluation Report Review. <br /> If you would like to apply for a Variance from one or more of the Onsite Wastewater Treatment and Disposal rules,you may <br /> apply for a Variance. Each review will require a fee. If you are interested in either of these actions,please contact Dan <br /> Wiltse at DEQ for more details before you proceed: <br /> Dan Wiltse, Natural Resource Specialist <br /> DEQ-Westem Region <br /> 165 East 7th Avenue, Suite 100 <br /> Eugene, OR 97401 <br /> 541-687-7436 or WILTSE.Daniel@deq.state.or.us <br /> If you have any questions about this report,please feel free to contact me at 503-503-365-3165. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system. Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site, or placement of wells or utilities,etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> lication. <br /> P <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy <br /> of the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted, and include the variance fee in OAR 340-071-140 Table 9C. A variance <br /> may only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical <br /> conditions render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned <br /> the variance application. <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1X00-332-2344.) <br /> 6/17/19:4:06:12PM Page 4 of 5 ONS OnsiteEvaluation_pr <br />