Laserfiche WebLink
• <br /> ,-; <br /> Lk <br /> Start-U:. ChecklistlAdvanTex° S stems <br /> , <br /> A.112- ON Start-Up Checklist• For Oregon Service Providers <br /> • . <br /> SecolidOry Treatineni:Systern Timer'Settings: <br /> ON-Thiai: <br /> ReClithilating Splitter Valve Assembly.;Verify the following:, j, OPP The: 19 <br />, E]Verify proper stinger.length:Stinger length: "),./4‘. OVR()lithe:. (.):• 4e. <br /> AdlienTO System(AX2ON).Verity the following ,OVR tiFF lime <br /> All pods Installed*el.. <br /> . .. <br /> - , • <br /> :., .Aliplping,PrOperly covereciandcsmpacted: <br /> tila ' : <br /> Proper wire size used based on Information provided by <br /> , ,manufacttom <br /> V <br /> •: El Conduit seal Installed • <br /> VoittilatiOn intake(s)-properly locatedancUristalled. <br /> A TeS.111eratIOM..Take residoa4ead•til:tOprenent: <br /> (de <br /> it;yttUM.Verify the following <br /> -" l electrical connections impanel are secure- <br /> Panel wired per manufacturer's wiring*Mem: <br /> Pod iff: .. . t..A. .;.:4,. Z..-- 2-At--.4 " Genital panel start up procedures,as detailed in timAdvariTex <br /> . . - Installation Guide;have been followed <br /> SecondaryIreatment Notes: corApproiarlate diagrams left In panel for future review <br /> trOIS Notes: <br /> _ . <br /> ... <br /> . . <br /> Discharge Pump 13asiniTanICVetylOtg: <br /> FlinaVISafetY Inspection <br /> Basin .Odellitirik*6(4' t< —1 <br /> ,, .. ... . <br /> rViSually:lespect basin/tanks for Infiltratleri., Verify VI::following: <br /> • . rE• . ' -. red,omaiLsplItOldireS, <br /> • .,,,• i eek-thatte-besinftankis.setieve,. <br /> --__. <br /> Discha e-Basiiirrank Pumping Equipment vow thtfollowtng:. • ri.• L.access riser hardware Is',In place:IJds am secOred, <br /> : .Net gAuiPment Installed properly <br /> 2 <br /> Pump end discharge plumbing are compatible <br /> pin '111'::Control panel documentation Is left at site;mils set <br /> forautomatic operation and secured <br /> •• 04-ixes* Final Notes <br /> *::ating). __,.. , <br /> mp•model Installed ?•r go f.6 1 1 <br /> 2 <br /> ;PIO:tine plumbIng properly Installed thiCtighWebutight <br /> ... ..comma,.and ball valve Is in open position <br /> 1 <br /> 79. <br /> .. <br /> .,-.1!.operate properly., <br /> - ' ,s.,_, <br /> FrA Fleetsset properly.1..-,14 era: igter 1 Homeowner's Package <br /> (P puce box mounted In access riser Watertight , • <br /> used; <br /> L.),Homeowner'sP4aga(and manual)has,beem reVloWed <br /> .-,. <br /> DtsChstge.,SaStniTanki'umplpg System.Verity proper operation of the with homeowner by (check one) <br /> discharge besinitunk.pumps. <br /> ED Installer <br /> 0 Puftipa:OPerate,in Manual 4"5,• ( ".‘-4AA—c--44'' X.Servict Provider <br /> bPumps operate In Atrtematic-vpvt.s <br /> ED Dealer <br /> Colifrals Other Notes: <br /> . „ . <br /> NoT.e.ftefer io Me:control:penal.instuntlenn,fbr-detailed Operational.. <br /> features of the control penel.iiseit. <br /> 11Th Winter: VIcY.S4 ot . . <br /> contral Panel:model installed:VW/VI ic•VX if„,)NI-eA <br /> ;sokap(ostetti <br /> le 2005 anima Symms,lac. <br /> , <br /> liii Ittill/C§ <br /> Pigs 2012. <br /> _ .. . . _....................._.............. <br /> ........ , ....... .... ._......__________________ <br />