Onsite Permit 555-19-000414-PRMT Page 3 of 3
<br /> Schedule Inspections online at www.buildingpermits.oregon.gov or by calling: 1-888-299-2821 or 503-588-5147
<br /> When calling for an inspection, use IVR Number:555099276827
<br /> ��,�"T3' ... )_.739WOr.. regy tt' .'Ae:`9w W2r�'�`,fi�r at n IM
<br /> ilt kd }3 11' � ANK�f 'YOR BATH tN AG jay Fg� rt �
<br /> � '? � � ey �'� a ' r� ' -s'��,� Tn -a'€��,� ;�,.s ��'l �es7��a.�'�* r�c"rx 3'n"�' �.:
<br /> r °aha , # ,k. ' A,x�y �O x -e-xr r S44- vs s�
<br /> ,4;7'3-.-< -' ,�-� �r�:� . �* �� x'�� ,,,a�.?a�:i`a�,,��,",,.�� �zeo.lsm**.�.' '-zi`�� ..., .,,,,.,...: .. �
<br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system
<br /> specified above.
<br /> Rules,Approved Material Listing; and Database of Licensed Installers can be accessed at:
<br /> http://www.deq.state.orus/wq/onsite/onsite.htm
<br /> General Conditions And Requirements For All Permits:
<br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is
<br /> noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received before.
<br /> the permit expiration date. Reinstatement of a permit may be granted if an application for permit reinstatement
<br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another
<br /> person may be granted if an application for permit transfer is received before the permit expiration date and no
<br /> other changes to the permit are necessary.
<br /> Installation Requirements:The drainfield must be installed in undisturbed native soil. No alterations of the
<br /> natural site conditions such as soil removal or filling, or slope/topography alterations within the approval areas
<br /> for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent. Do not
<br /> install system when soil moisture, high groundwater, adverse weather, or other conditions that could affect the
<br /> quality of installation or reliability of the system are present. If such conditions are present and there is a need
<br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in
<br /> 340-071-0160(9).
<br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when
<br /> the construction, alteration, or repair of a system for which a permit was issued is completed(except for the
<br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the
<br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection
<br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection
<br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final
<br /> inspection. Faxed copies are acceptable for inspection request purposes only. Originals must be received
<br /> before a Certificate of Satisfactory Completion can be issued.
<br /> System Backfill Requirements:The system is to be backfilled or covered as follows:
<br /> *Only after the permitting agent has approved the construction installation,
<br /> *or the inspection has been waived
<br /> *or the Certificate of Satisfactory Completion(CSC)has been issued by operation of law(where the inspection
<br /> has notbeen conducted within 7 days of notification of completed installation).
<br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after
<br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The
<br /> backfill must be free of large stones,frozen clumps of earth, masonry, stumps,waste construction materials, or
<br /> other materials that could damage the system. Be sure that the untreated building paper,filter fabric,or other
<br /> material approved by the agent is completely covering all drain media where required prior to backfill.The
<br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been
<br /> issued.
<br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated
<br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt or
<br /> concrete,filling,cutting, or other soil modifications.
<br /> 1/23/19
<br /> 1/23/19:2:11:03PM Page 3 of 3 ONS_OnsitePemiit_pr