Laserfiche WebLink
Page 4 of 4 <br /> Septic Site Evaluation 555-19-002107-EVAL <br /> 1W,1717„,4 ����:'�h���� <br /> Fkk�a"k:- "4,5' Y.s"A d^ ^✓t obi r,,.•.,wt <br /> f Or�c c p--4-8 FEET Ii *BC"1"*k 8 O3Q = <br /> ..�y,. <br /> .......... <br /> these flow quantities is exceeded. If, for some reason,you expect your water use may exceed these flows,it may be <br /> advisable to increase the size of the treatment system. <br /> 2. Any alteration of natural soil conditions(i.e. cutting, logging, or filling)in the acceptable area may void this approval. <br /> Continued disturbance in the area of the approved test pits is highly discouraged. <br /> 3. Both the initial and replacement disposal areas are to be protected from traffic, livestock and farming activities, <br /> development or other potential disturbance of natural soil conditions. <br /> 4. The area must not be subjected to excessive saturation due to, but not limited to, artificial drainage of ground surfaces, <br /> roads,driveways and building down spouts. <br /> 5. This approval is given on the basis that the parcel described above will not be further partitioned or subdivided. <br /> 6. Placement of a well within 100 feet of the approved areas may invalidate this approval. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system. Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site, or placement of wells or utilities, etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation reportissue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy <br /> of the site evaluation report, plans and specifications for the proposed system,specify the rules)to which a variance is ng <br /> requested,demonstrate the variance is warranted, and include the variance fee in OAR 340-071-140 Table 9C. A variance <br /> may only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical <br /> conditions render strict compliance unreasonable,burdensome or impractical. A senior DEQ variance officer will be assigned <br /> the variance application. <br /> Matthew Puntney Onsite Inspector 4/19/19 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1 80032-2344.) <br /> Page 4 of 4 <br /> 4/19/19:4:05:22PM ONS_OnsiteEvaluation_pr <br /> 1 <br />