My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8560719
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
17-XXXXXX
>
8560719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2019 10:00:31 AM
Creation date
3/14/2019 9:49:37 AM
Metadata
Fields
Template:
Permits
Permit Address
2642 EKONIE LN S
Permit City
SALEM
Permit Number
555-17-003875-PRMT-01
Parcel Number
083W32 04100
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-17-003875-PRMT-01 Page 3 of 3 <br /> Schedule Inspections online at www.buildingpermits.oregon.gov or by calling: 1-888-299-2821 or 541-388-6575 <br /> When calling for an inspection,use IVR Number:555027013374 <br /> Date,Issued;6/14/1'7 Expiration D"ate 6714/18 <br /> Work;Description ""a. ;MIN AL1 'MOVE PRESSURE LINE£FROM TANK TODF, , F.... a <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing; and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date <br /> is noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received <br /> before the permit expiration date. Reinstatement of a permit may be granted if an application for permit <br /> reinstatement Is received within one year after the permit expiration date.Transfer of a permit from the <br /> permittee to another person may be granted if an application for permit transfer is received before the permit <br /> expiration date and no other changes to the permit are necessary. <br /> Installation Requirements: The drainfield must be installed in undisturbed native soil. No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval <br /> areas for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent. Do <br /> not install system when soil moisture, high groundwater,adverse weather,or other conditions that could <br /> affect the quality of installation or reliability of the system are present. If such conditions are present and <br /> there is a need for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as <br /> outlined in 340-071-0160(9). <br /> Inspection Requirements: The system installer and/or the permit holder must notify the permitting Agent <br /> when the construction, alteration, or repair of a system for which a permit was issued is completed (except for <br /> the backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the <br /> inspection and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final <br /> Inspection Request and Notice form by the permitting agent establishes the official notice date of your request <br /> for the final inspection. Faxed copies are acceptable for inspection request purposes only. Originals must be <br /> received before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements: The system is to be backfilled or covered as follows: <br /> * Only after the permitting agent has approved the construction installation, <br /> * or the inspection has been waived <br /> * or the Certificate of Satisfactory Completion (CSC) has been issued by operation of law (where the <br /> inspection has not been conducted within 7 days of notification of completed installation). <br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones, frozen clumps of earth, masonry,stumps,waste construction materials, <br /> or other materials that could damage the system. Be sure that the untreated building paper,filter fabric, or <br /> other material approved by the agent is completely covering all drain media where required prior to backfill. <br /> The system canbe connected to and placed into service once it has been properly backfilled and the CSC has <br /> been issued. <br /> Initial and Replacement Areas — Protection: The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways, covering with asphalt <br /> or concrete,filling, cutting, or other soil modifications. <br /> Matthew Puntney 6/14/17 <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain copies <br /> of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 6/14/17:8:26:40AM Page 3 of 3 C:\myReports/reports//production/01 STANDARD <br /> REPORTS/std_OnsitePermit_v2_pr.rpt <br />
The URL can be used to link to this page
Your browser does not support the video tag.