Laserfiche WebLink
16.33.560 STREET LIGHTING. Proposed subdivisions located within established street lighting district <br />boundaries shall submit street lightingplans from the appropriate power company to the director ofpublic works <br />for approval. All provisions for wiring for underground installation shall be completed before the final street <br />improvement is made. <br />The property is not within the boundary of an established lighting district. <br />16.33.340 PRIVATE STREETS. In the event the subdivider or developer elects to provide private streets or <br />thoroughfares, they shall be maintained by the homeowners association and a maintenance agreement shall be <br />submitted to Marion County for review and approval prior to recording the final plat. <br />LDEP will require a road maintenance agreement for the private street. <br />Access standards: These standards are listed in MCC 16.33.680 and state: All lots must have a minimum 20 feet <br />of frontage on a public right-of-way or, when an access easement is proposed to serve one or more lots in any <br />partitioning, the location and improvement of the roadway access shall conform to the following standards which <br />are necessary for adequate access for emergency vehicles. Evidence that the access has been improved to these <br />standards and a driveway permit has been obtained shall be provided prior to the issuance of building permits on <br />the parcels served by the access easement. The easement shall meet the following standards: <br />A. Have a minimum easement width of 25 feet; <br />B. Have a maximum grade of 12 percent; <br />C. Be improved with a paved surface with a minimum width of 20 feet; <br />D. Provide adequate sight -distance at intersections with public roadways; <br />E. Be provided with a road name sign at the public roadway as identification for emergency vehicles in <br />accordance with Chapter 11.55 MCC, Naming and Addressing Roads/Property. <br />The private roadway being created for this development meets the above standards. The roadways must all be <br />named and lots using them for access with be addressed accordingly. The names must be approved by Marion <br />County and must be shown on the final subdivision plat. Prior to recording the plat, a work order for the street <br />sign installation, with appropriate fee, must be submitted to Marion County Department of Public Works. <br />10. 16.33.1020 TIME LIMIT FOR THE FILING AND RECORDING OF A PLAT. When the subdivider has <br />expressed intent to develop a subdivision in phases or stages, the first phase of the final plat, or, if not to be <br />developed in phases or stages, the completed final plat must be filed with the director by the first day of the 24th <br />month following the date of detailed approval or said detailed approval shall be deemed null and void. The final <br />plat shall be approved by public officials as required by law and recorded within 180 days following the date the <br />plat is submitted to the director. Extensions to either time deadline may be approved by the director upon <br />submittal of written justification prior to the expiration of the time limit. <br />If the applicant decides to develop the subdivision in phases it must be expressed in writing prior to submitting the <br />plat for the first phase. <br />11. Planning Commission closed the public hearing. A motion was then made and seconded to grant conceptual and <br />detailed approval of the subdivision. The motion passed unanimously. <br />SIGNED AND FINALIZED THIS 20th day of April, 2016 <br />By <br />Warren Jac son <br />Planning Commission Secretary <br />