Laserfiche WebLink
~ Item 1.3 FIRE SAFETY PRECAUTIONS <br />~ G. A Fire Safety plan shall be prepared, prior to any demolition, detailing all fire safety <br />measures which will be addressed during the demolition. The plan shall be provided to the <br />Owner for review and comment. <br />~ A weekly status report shall also be provided during the entire demolition <br />detailing the status of each measure <br />have seen no correspondence with contractor and fire department setting up meetings and <br />inspections <br />Section 01568 <br />Environmental Protection <br />Page 1 of 5 <br />~ Item 1.3 PROTECTION OF ENVIRONMENTAL RESOURCES <br />~ E. Noise control <br />~ At least once every five successive working days while work is being <br />performed, above 55 DB noise level, measure sound level for noise exposure due <br />to the demolition. Measure noise exposure at the property line or 50 feet from the <br />noise source, whichever is greater. Submit the recorded information to the Owner <br />noting any problems and the alternative for mitigating actions. , <br />Section 02090 <br />Lead Handling <br />Page 1 of 2 <br />~ 1.3 QUALITY ASSURANCE <br />^ OAR 437-03-001 (29 CFR 1926.62) regarding occupation exposures to lead. These <br />rules require a written lead compliance program and initial personnel monitoring, and <br />define methods of compliance if the action level for lead is exceeded. <br />~ 1.4 SUBMITTALS <br />~ A. 1. A written, site-specific lead compliance program under the direction of and <br />stamped by a Certified Industrial Hygiene (CII-~ <br />site specif c lead compliance program is submitted but not stamped by certified industrial <br />hygiene <br />6 <br />