My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUR'I'I~QUSE SQUARE <br />SUBSUIdFACE REi~iIEDIATION PRESENTATION OUTLINE <br />1) Researched historical activit~es to identify saspect areas of contamination: <br />three gasoline service stations, several automobile and battery repair <br />facilities, one known UST and several areas of suspected USTs, drywells <br />2) Conducted a pre-demolition subsur.f~rP investigation to evaluate soil and groundwater <br />contamination at known or suspect areas. This further defined the nature and extent of <br />subsurface contamination: <br />17 areas of known or suspected subsurface contamination were identified, <br />including one area of gasoline contamination (Chevron) and several areas <br />of diesel contamination resulting from historical use/storage of petroleum <br />products on site <br />3) Developed a pre-construction remediation work plan to investigate and/or remove <br />contaminated soil and groundwater from the 17 areas of known or suspected <br />contamination. One objective was to "clear° the construction phase excavation/work <br />zone (ground surface down to 12 feet) from subsurface contamination. The Oregon <br />Department of Environmental Quality (DEQ) reviewed and approved of the work plan. <br />4) Implemented the pre-construction remediation work plan between October 1997 and <br />January 1998, which included: <br />• excavation and off-site disposal of approximately 7,368 tons of petroleum <br />contaminated soil <br />• excavation and off-site disposal of approximately 6,888 cubic yards of <br />non-impacted overburden soil <br />• removal and treatment of 367,250 gallons of petroleum contaminated <br />groundwater <br />~ ~:~~ ~o~~uiiissi~r~ir.g ~iiir~~ TJSTs - f~ve dccor~missi~ned in nl~ces an~ four <br />dECOrz~:~.i~si~n~d by r~moval <br />5} ~:ssaed tl~r~~ r::;~cs-ts in Niar.ch - a~ril ? g>;~ ra~~~;;„~~r~ti~3~ ~~,i,:.e~iial ~~t~vitie~ a:~c~ <br />rP~or~:.r~.;:,nding c~~sure far t~:~ 1"I ~:t~;; c~n 3:rfe ~;~~~:~F~c~~~~ S~uaz°~ block. `~~l~e tl~.:,:e reports <br />aa~e cu~ently~ bei~1~ .~viewec~ t~y th~ ~EQ. . <br />b) ~ srr~all ~~~~k~i ti~~ c~~tariii~~ti+~;~ asse~:ated wit~. t~~e f~r~r~~r Ch:;v~an ~~,rvice ~a~tion was <br />teft in p:~cz in ¢?~e soutliea,t c~~r± ;r of the bl~c~e ~lue r~ c~:~ce,ns ~~r,r stre~: s~~il~ty. ~1sr~g <br />DRAT~"; <br />Centary West ~:rsgi?ieeri~~ - 1- Aprii 28, 1?98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.