Laserfiche WebLink
Public Works Job Cost Transaction Report 11/20/00 Page 5 <br />Design: JOBCOST.RPT <br />~ ~ ~ ~ Qperator : TERESA <br />00-21032 TRANSIT MALL RBMOVAL <br />BOB MCCUNE <br />COST CENTER 114-00-914 <br />Activity Category Date Prod Units Hours/Units Burdend Amount <br />_______..____..___________________________________________________________________________ <br />830c CONSTRUCTION ENGINEERING <br />10/25f00 2.00 7.90 <br />10/26/00 2.00 20.30 <br />10/26/00 6.00 60.90 <br />10/27/00 2.00 20_30 <br />10/27/00 1.00 66.54 <br />10/27/00 17.16 98.67 <br />CategoryTotaZ: 31.16* 276.58* <br />Activity Total: 428.50* <br />824.66* 18,732.54* <br />850c INSPECTION <br />Equipment 10/21/00 E624 3.00 12.00 <br />10/21/00 E640 28.00 84.00 <br />10/28/00 E640 41.50 124.50 <br />11/04/00 E640 16.50 49.50 <br />CategoryTotal: 89.00* 270.00* <br />Labor 10/18/00 1774 7.50 242.12 <br />10/21/00 1161 6.00 123.01 <br />10/21/00 1774 25.50 554.45 <br />10/21/00 96841 3.00 113.48 <br />10/23/00 1774 3.00 96.85 <br />10/28/00 1774 38.50 837.11 <br />10/28/00 10708 6.00 244.49 <br />10/31/00 1774 7.00 152_20 <br />10/31/00 10708 5.00 203.75 <br />11/04/00 1774 9.50 206.56 <br />11/04/00 10708 7.00 285.24 <br />11/04/00 96841 2.00 75.65 <br />CategoryTotal: 120.00* 3,134.90* <br />-------- <br />Activity Total: <br />-------- - <br /> <br />- ------------ <br />209.00* ---------- <br />3,404.90* <br /> <br />-------- <br />Job Total: 432.55* <br />- ------------ <br />------------ <br />1,105.16* ----------- <br />----------- <br />24,752.69* <br />