Laserfiche WebLink
~ Pence Kelly Construction, Inc. <br />< Project: Courthouse Square <br />Location: Salem, Oregon <br />Issue: 216 Provide Deck Coating System per PR #54 <br />Cost Estimate Summary <br />Job No.: 9906 <br />Estimator. JG <br />Print Date: 03-Dec-99 <br />COR #: 146 <br />DESCRIPTION QTY UNIT MH/UNIT LABOR <br />HR S/HR LABOR COS Waste <br />~, SUNITlMAT MAT COST SUB fIUNIT SUB S EQP.S/UNIT EQUIP.S <br /> 0 $ _ <br /> <br />Three Coat Elastomeric Vutkem Tra <br />ffic Deck Co <br />atin S stem <br />0 <br />$ $ ~ 5 <br /> <br />° <br />$ S 5 37,432.00 ~ <br /> <br />° <br />$ a $ s <br /> $ $ s <br />TOTALS ~ $ $ $ - S - <br /> <br />B 3 3t,432.00 5 <br />Altemate: <br />ond ; <br />Direct Cost S <br />MU Subcontreetor perFormed work (d 15% S <br />MU Pence/Kelly perfortned work ~ 5% S <br />Totai Cost f <br />189 <br />31,6T1 <br />4,715 <br />36,335 <br />DESCRIPTION pTY UNIT MH/UNIT LABOR <br />HR E/HR LABOR COS Waste <br />~, SUNIT/MAT MAT COST SUB S/UNIT SUB S EQP.S/UNIT EQUIP.S <br /> ~ $ <br /> <br />Vuikem Pedestrian Coatin S stem <br />0 <br />$ $ $ 5 <br /> <br />~ <br />$ $ S 29,690.00 g <br /> $ ~ $ <br />- <br /> p g _ $ S S <br />TOTALS ~ $ _ $ $ - $ - <br /> <br />B 5 29,690.00 $ <br />ond S ~78 <br />Direct Cost S 29,868 <br />MU Subcontractor performed work ~ 15 % S 4,454 <br />MU Pence/Kelly periormed work ~ S% j . <br />Total Cost S 34,322 <br />