My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Purchase Orders (miscel)
>
CS_Courthouse Square
>
Financial- Purchase Orders (miscel)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:32:31 PM
Creation date
9/7/2011 9:57:45 AM
Metadata
Fields
Template:
Building
RecordID
10221
Title
Financial- Purchase Orders (miscel)
Company
Marion County
BLDG Date
11/28/1998
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />F~ ~~~~rwoR~~~ <br />,~ <br />SERVICE ESTIMATE <br />oate: September 21, 2~00 <br />Servtce Order Prepared By: <br />Darcy Tucker <br />FirstWorld Northwest Worlc Ordet# 00-F026 Customer Work Order # <br />Customer Name Marion Data Genter Customer ContaCt Chuck Fauser <br />Custamer Phone 588-6351 Extension <br />~' <br />Faz 588-6369 <br />Customer Address: 690 Ferry St. NE City Satem <br />State OR ZIP 97310 Building Name Marion Courkhvuse Square <br />Department <br />Floo~ Basement thru 5th fl, <br />Secondary Contact ~ Phone <br />Small Job Quote Q <br />Trouble TiCk~t ^ <br />~uote Buitt From Standard Materials L[st <br />( 24 to 4e hr. potential fead Ume roquired ) <br />T&M ^ RFP ^ <br />Change Order ^ Walk Through Notes ^ <br />~ QuotE Buitt From Non Standard Materials List ^ <br />(Meterlal avAilabilityr to be reseerclled) <br />SCO,P~ OF Wdf~K <br />FlrstWorid NOrthw~st to Provide and Install: <br />Date Cenber _,.-~ . <br />Provide customer with: <br />1) 5 meter, SC to ST, SM patch Cvrd. <br />1) 2 meter, SC tn SC, SM patch cord, <br />8) 2 meter, SC to SC, MM patch cord. <br />7ha informallon contained harain, including the quotes provided, is confidential and proprietary to FfrstWoNd Northwest. This information may <br />be ehared with third parties wlthout the expressed wtitten approval of FirstWOrld Northwest, <br />Customer Requested Dates: Start Complet~ <br />g/27/pp Scope Of Work OO~f026 <br />Page 1 <br />Terminate these ends as weft. AN room will get ST connectors w/ angled wall plate and 4th fl. Witl have SC cannectors. <br />4th FI. MDF <br />Out of MDF, torminate 4) B strand,MM, fiber cables nn both ands. (1 to 5th, 1 to 3rd, and 1 to each of e 2 dosets on 2nd.) <br />All terminations wili be SC connectors. Place cable in new FODUs in all dosets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.