Laserfiche WebLink
Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />COUrt & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Satem, Oregon 6441 SW Canyon Court, Suite 103 Print Oate: 21-Aug-98 <br />Arbuckie Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:12 AM <br />Des' n Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />DIRECT CONSTRUCTION COST SUMMARY <br />~ <br />Component Area $/ SF Cost Comments <br />- - <br /> <br /> <br />Building Shell & Core <br />~ <br />153,343 sf 73.45 11,262,900 ~ ~ <br /> <br />I <br />I <br />Parking 70,793 sf 42.67 3,020,512 ~I <br />Bus Mall 66,528 sf 37.63 2,503,582 i <br />I <br />Subtotal 22a,~36 sf 7a.9o $16,786,995 i <br />Streetscape 33,720 sf 50.15 1,691,150 <br />Subtotal 33,~2o sf 50.15 $1,691,150 <br />Tenant Finishes <br />Ground Level Tenant Finishes 13,930 sf 42.85 596,862 <br />Second Floor Tenant Finishes 27,552 sf 17.49 481,994 <br />Third Floor Tenant Finishes 28,279 sf 24.66 697,318 <br />Fourth Floor Tenant Finishes 28,279 sf 22.72 642,601 ; <br />j Fifth Floor Tenant Finishes 16,850 sf 31.11 524,203 ~ <br /> 11a,890 sf 25.62 $2,942,978 ; <br />i <br />TOTAL DIRECT CONSTRUCTION COST $21,421,123 I. <br />~ <br /> <br />Bud et ~ ~ <br />i <br /> <br />Indicated Surplus / (Deficit) (21,421,123) I <br />~ <br />ALTERNATES <br />1 Parking Altemate 1 23,278 sf Add t 930,300 <br />2 Parking Alternate 2 19,467 sf Add t 808,500 <br />30 ~ <br />40 ~ <br />The above estimates are for direct construction cost only. They do not include fumishings & equipment, consultant <br />fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any ~~ <br />~ <br />other normally associated development costs. <br />~, <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major ' <br />sub-trades as well as the general contractors. All wo~lc to be contracted at one time (shell & core, street & bus mall and <br />tenant imorovementsl. If oroiect is to be ohased. additional cost associated with ohasina to be added. <br />