Laserfiche WebLink
~ ~ ~ <br />~ <br />!Courthouse Square Arch itectural Cost Consultants, LLC ~ ~ <br />Estimate Date:R21-Aug-98 <br />! <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Oregon <br />Salem 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />, <br />;Arbuckle Costic Architects, Inc <br />~ Portland, Oregort 97221 <br />Phone (503) 297-7210 Fax (503) 297-7187 Print Time: 1120 AM <br />Construction Start: Spring 99 ~ <br />iDesign Development Probable Cost Estimate <br /> <br />!Streetscape <br />Quantity <br />Unit <br />CosUUnit <br />Cost Total ; County ~ - --- - --. <br />Transit ~ Streetscape ~ <br />Comments <br />I DEMOUTION <br />i - <br />sawcut ac pavement 2,508 If $1.50 $3,762 ' ~.~69 j ' <br />remove ac pavement 17,153 sf 0.45 7,719 ~, j ' <br />071 ' <br />2 <br />remove concrete pavement 2,180 sf 0.95 2,071 ~ ; , <br />, <br />remove curb & gutter 1,512 If 2.25 3,402 I , 3,402 ; <br />remove stump 1 sum 50.00 50 j <br />' <br />~ 50 li <br />500 ; <br />2 <br />remove foundation 1 sum 2,500.00 2,500 , <br />remove light poles 6 ea 175.00 1,050 ' <br />I ' 1,050'. <br />O;N <br />IC - By Others (if required) <br />hazardous material removal 0 sum 0.00 ~ <br />0 <br />misc. removal, cut & patch 1 sum 2,500.00 2,500 2,500'~. <br />haui & disposal 1 sum 2,300.00 2,300 <br />~ I- - <br />- - --?,300 ; <br />' , <br />Subtotal $25,354 $0 $0 <br />I $25,354 <br />' - -- <br />TOTAL - DEMOLITION $25,354 i $0 } _ $0 I $25 3547 <br />' <br />_ ___ <br />~ <br />_ <br />' SITE WORK _ _ <br />, _ _ _ _ _ , <br />_ _ ~ <br />, ~ <br />_ _ <br />_. : <br />Earthwork <br />level & grade <br />32,795 <br />sf <br />0.75 <br />24,596 <br /> <br />I <br />24,596 i <br />' <br />dewatering 1 sum 5,000.00 5,000 ; 5,000 , <br />mobilization 1 sum 15,000.00 15,000 ~__ __ _ _ <br />96 ~ $0 _ __ ~ <br />-- <br />$0t 15,000 ; <br />--- <br />$44 <br />596 ~ <br />Subtotal $44,5 I <br />' <br />I <br />, <br />, , <br />Utilities i <br />I I <br />i ' ' <br />storm drain system <br />11 <br />If <br />00 <br />750 ' <br />250 i <br />8 ~I , <br />8,250 ~ <br />catch basin <br />manhole 1 If . <br />2,000.00 , <br />, <br />2,000 ~ !, 2,000 , <br />' <br />connect to existing 1 If 1,000.00 1,000 i i 1,000 <br />piping <br />g~~ <br />162 <br />If <br />22.00 <br />3,564 <br />! <br />3,564 ' <br />g~~ 144 If 24.00 3,456 I ! 3,456 ! <br />10" 68 If 28.00 1,904 I 1,904' <br />~ 2~~ 48 If 30.00 1,440 , iI <br />1 1,440 <br />15" ' 1,145 If 34.00 38,930 <br />1_ ~ <br />' -- <br />------ 38,930 ; <br /> <br />~' <br />Subtotal $60,544 $0 ~ $0 ~ $60,544 <br />Streetscape Deta~~ Estimate - Page 1 <br />