Laserfiche WebLink
Removal of Existin4 Transfer Facilitv~ . <br />~,,, The current facility was developed in cooperation with the Transit District <br />utilizing a combination of District and Renewal Funds. Given the completion of <br />a new facility, it is consistent wifh the objectives of the renewal program to <br />restore the existing site to vehicular circulation. - <br />Weather Protection: <br />Weather protection is an established. program. The current process requires <br />the owner to design a system meeting certain standards_ An agreement is <br />established where the renewal program will provide up to $160 per lineal foot <br />of system construction. Systems with costs of $161 to $300 per lineal foot are <br />provided through a loan. <br />Skvbridges: <br />The objective of skybridge construction has been to interconne~t retail <br />business for public access at the second level. The current policy for <br />construction has been for each of the connected property/building owners to be <br />responsible for reimbursing, with interest, the cost of bridge design and <br />construction. To participate in a bridge connecting no~-retail facilities would <br />require a policy consideration. <br />The above is intended only as a thumb nail sketch. It would be advisable for you to <br />~ confirm in the near future which activities you intend to pursue. We will eventually <br />need to establish a cooperation agreement which identifies the specific projects, their <br />~ anticipated cost, and responsibility for design and construction. Obviously, Renewal <br />funds are subject to the same public bidding and contract requirements as other <br />publicly funded projects. <br />Please advise if we can provide further assistance at this time. <br />