Courthouse Square Internal Staff Team Meeting <br />Minutes of March 12, 1998 <br />/ <br />Present: Marion County: Gene Berg, Randy Curtis, Sheryl Derting, Carol Fischer, Michael <br />Hansen, David Hariwig, Larry Oglesby, Ken Roudybush, Billy Wasson, Don Wyant, <br />Jr.; Transit: R.G. Andersen-Wyckoff, Mark Wieprecht, Tom Wolfgram, John <br />Whittington; Melvin Mark: Craig Lewis, Dan Petrusich <br />Agenda: <br />l. Status on SPOC Report <br />2. Construction Schedule Draft - Melvin Mark <br />3. Evaluation of $1.30 Rate Draft - Randy Curtis <br />4. County Impact Analysis <br />5. North End of Block RFP Development <br />6. Other Work Items <br />1. Status on SPOC Re~2rt <br />Billy Wasson reported he has had no direct communication with Justice Petersen. The Justice did <br />call Randy Franke, but since Randy Franke was not in attendance status is unknown. The report is <br />expected to be ready Friday. <br />2. ('onstruction Schedule Draft <br />Craig Lewis handed out a copy of a construction schedule that Melvin Mark completed. They <br />assumed a start date of April 1, 1998. Design time was worked out with Arbuckle Costic and they <br />have been given enough time to complete work. The actual construction time was given 16 months <br />from mobilization to owner turnover. This could be improved by general contractor choice and <br />more efficient methodologies. The targeted completion date was June 14, 2000. <br />Randy Curtis asked about revisiting a previous issue of phasing in occupancy of the building as the <br />floors were completed. Dan Petiusich responded that this schedule is set up to have all floors done <br />by completion date and this approach would have no real advantage or time advantage to pursue. <br />The physical move in of depa.rtments would take a phase-in effort to bring systems on line a.nd move <br />equipmentlfurniture. If the space plans for the building are completed ea.rly enough, tenant <br />improvements (TI's) can start on the lower floors first. The general contractor should be on boazd <br />to participate in this discussion. Some space planning has been started, but Randy Curtis and Billy <br />Wasson will meet with Leonard Lodder, Arbuckle Costic to follow up. <br />During a four hour county meeting for department heads on Tuesday, Courthouse Square update <br />was a major focus. It was determined it had been a while since depa.rtments were given an update <br />on space allocations, and we need to catch up our internal departments planning on moving into <br />Courthouse Square. <br />Page 1 of 4 <br />