3. Evaluation of 5130 Rate Draft <br />~ Randy Curtis handed out a copy of his report on the proforma analysis. While the proforma is <br />based on the $1.30 rental rate, we have not abandoned our goal of lowering the rate into the $1.20 <br />range. <br />The proforma has two basic components: debt service and operations & maintenance (O & 1Vn. <br />Debt service is estimated at appro~mately $1.00/s.f. and represents principal/interest payments of <br />$21,115, 717 on revenue bonds. Debt service is affected by two variables: construction costs, <br />which are approximately 6-8 months old and interest rates currently at 5.25% amortized over 25 <br />years. <br />O& M costs have been estimated at $0.30/s.f. County Facilities Management ran a comparison <br />with county buildings on the same components and came up with $0.31/s.f. Arbuckle Costic also <br />provide information on the newly constructed Robertson Building in Salem and O& M expenses <br />aze $0.23/s.f. for this building, which is new and warranty on building equipment is holding first <br />O& M costs down. County's current O& M costs are higher than the projections used in the <br />proforma. A policy decision has been made to contract out these services, if the county cannot <br />reduce costs over the next two years. <br />The next part of the report outlines some of the risks/options/vaziables of the proforma that are <br />noteworthy: <br />~,, 1. Rental rate doesn't include building reserve fund. Discussion by staff changed terminology <br /> to sinking fund, rather than building reserve fund. <br />2. Construction estimates tentative/subject to fmal design & competitive bid. <br />3. Utility and labor costs may exceed estimates. <br />4. Interest rates may climb prior to fmal financing. <br />5. Demand for Class A& B office space may drop resulting in higher vacancy rates and longer <br /> <br />6. leasing time. <br />Amount of parking required, including 59 above ground spaces, and associated costs not <br /> finalized. Parking issues have not been resolved and strategies need to be addressed with <br /> <br />7. the city of Salem. <br />Costs for remodeling the Franklin Building and Courthouse have not been included. After <br /> staff discussion, this item will change phrasing to costs "have been established, and are not <br /> included as Courthouse Square expense". <br />8. Change in cost sharing formula between transit/county could shift expenses. Background <br /> was given on how original formula was determined in the land sale agreement. Transit is <br /> working to maintain the 42% and is working with FTA to keep it. A revisit to the formula <br /> will force blanks in current agreement to be redefined. <br />9. Change in Salem's Streetscape funding could alter cost estimates to complete project. Staff <br /> held discussions on this issue. City has budgeted $2 million for this project, but not sure <br /> which year it is in. The latest Pence/Kelly streetscape numbers based on city's current <br /> design standards were over the $2 million, and were presented to the city. <br />~ <br /> Pa e2of4 <br />g <br />