Laserfiche WebLink
Court 8~ High Street <br />Salem, Oregon <br />Arbuckie Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Fifth Floor <br />Transit <br />Solid Waste <br />Total Area <br />Fifth Floor Tenant Finishes <br />Unit <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczoikowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />10,918 <br />5,932 <br />16,850 sf <br />Unit Cost Total <br />~ <br />Estimate Date: R18-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: Sprinq 99 <br />sf <br />WOOD & PLASTICS - Continued <br />Casework - Continued <br />toilets <br />lav counter 16.0 If 125.00 2,000 ', ~ <br />pp~ <br />solid waste ~ <br />work / files / supplies <br />base cabinet 15.0 If 165.00 2,475 2 <br />47'S <br />wall cabinet 15.0 If 85.00 1,275 , <br />' 1 <br />275 <br />break room , <br />base cabinet 11.0 If 165.00 1,815 ~ <br />g~s <br />wall cabinet 8.0 If 85.00 680 ~ <br />680' <br />copy / print <br />base cabinet 7.0 If 165.00 1,155 1 <br />158 <br />wall cabinet 7.0 If 85.00 595 , <br />' 595 <br />comp / work <br />base cabinet 24.0 If 165.00 3,960 3 <br />960 <br />wall cabinet <br />S <br />btot <br />l 24.0 If 85.00 2,040 , <br />~,p~0 <br />u <br />a 37,140 0 °23,145' 13,995-- 2.20 <br />TOTAL - WOOD & PLASTICS 538,825 $0 $24,237' $14,5$8 2.30 <br />MOISTURE - THERMAL CONTI <br />Firesafing <br />allowance <br />Subtotal <br />Caulking & Sealants <br />caulking / sealants <br />Subtotal <br />TOTAL - MOISTURE - THER <br />16,850 sf 0.04 <br />16,850 sf 0.07 <br />NTROL <br />Fifth Floor Tenant Improvements Detail Estimate - Page 2 <br />