Laserfiche WebLink
CourtH~use Square Architel`~~ural Cost Consultants, LLC Estimate ~"ate: R18-Aug-98 <br />COU~t 8~ High St~eet James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 I <br />Arbuckie Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM ' <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />FouRh Floor <br />Total Area 28,279 <br />28,279 sf <br />Fourth Floor Tenant Finishes Quanti Unit Cost/Unit Cost Total Comments <br /> <br />MECHANICAL <br />HVAC <br />HVAC system <br />28,279 <br />sf <br />2.50 <br />70,698 <br />7Q,698 <br />Subtotal <br />Plumbing <br />sinks <br />waterclosets <br />urinals <br />lav sink <br /> <br />2 <br />3 <br />1 <br />4 <br /> <br />fixt. <br />fixt. <br />fixt. <br />fi~. <br /> <br />2,500.00 <br />2,500.00 <br />2,200.00 <br />2,000.00 <br /> <br />5,000 <br />7,500 <br />2,200 <br />8,000 70,698 0 70,69$` <br /> <br />5,0~(7 <br />7,500' <br />2,200 <br />$~000 ! 2.50 <br />Subtotal <br />Fire sprinklers <br />sprinklers <br /> <br />28,279 <br /> <br />sf <br /> <br />0.50 <br /> <br />14,140 22,700 0' 22,700' <br /> <br />14,140 0.80 <br />Subtotal 14,140 0 14,140 0.50 I <br />TOTAL - MECHANICAL $107,537 $0 $1fl7,537 3.80 i <br /> <br />ELECTRICAL <br />Power & Lighting 28,279 sf 3.50 98,977 98,977 <br />Subtotal 98,977 0 98,977 <br />TOTAL - ELECTRICAL ~98,977 $0' $98l977 3.50 <br /> <br />SUBTOTAL 4s3,221 $493,221 A 493;221 <br />RA IT ° <br />GENERAL CONTRACTOR FEE <br />ESTIMATING CONTINGENCY <br />INDEX TO CONSTRUCTION START <br /> <br />Spring 99 3.75% <br />7.00% <br />0.75% 19,929 <br />38,596 <br />4,425 <br /> <br />$101,175 0 <br />0 <br />0 19;929 <br />38,596 <br />4,425 ~, <br />~ <br />@ t 3% per year I <br />TOTAL DIRECT CONSTRUCTION COST <br />Fourth Floor Tenant Finishes <br />28,279 <br />sf <br />$21.02 /sf <br />$594,396 <br />$0 <br />$594,396 I <br />~ <br />Fourth Floor Tenant Improvements Detail Estimate - Page 7 <br />