Laserfiche WebLink
~ ~ ~ <br /> <br />Courthouse Square --- <br />Architec ural Cost Consultants, LLC <br />Estimate Dafe: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Jui-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 1&Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br /> <br />Fourth Floor 28,279 <br />Total Area 28,279 sf <br />Fourth Floor Tenant Finishes Quanti Unit CosUUnit Cost Total Comments <br /> <br />FINISHES - Continued <br />Ceilings <br />install ceiling grid 8~ tiles 26,475 sf 0.58 15,356 15,~56' <br />Subtotal 15,356 ': ' 0 15,356 <br />Ceramic Tile <br />floor tile <br />type E 362 sf 9.75 3,530 3,530 <br />base <br />type F 156 If 10.00 1,560 1,560 <br />wall tile <br />type F 588 sf 8.75 5,145 5,145 <br />Subtotal 10,235 0 10,235 <br />Resilient <br />vct 1,042 sf 1.75 1,824 1,824 <br />rubber base 4,660 If 1.50 6,990 6,990 <br />Subtotal 8,814 0 8;814 <br />Carpet <br />type 1 68 sy 21.62 1,470 1;470 <br />type 9 2,983 sy 18.62 55,543 55;543 <br />Subtotal 57,014 0 57,014 <br />Paint & wallcoverings <br />paint / finish door 8~ frame 47 ea 60.00 2,820 2,820 <br />aint / finish relite frames 2 ea 40.00 80 80 <br />paint gypboard ceilings 362 sf 0.60 217 217 <br />paint walls 33,808 sf 0.45 15,214 15;214 <br />vinyl wall covering 5,414 sf 1.50 8,121 8,121 <br />miscellaneous specialty painting 1 sum 1,500.00 1,500 1,500 <br />Subtotal 27,952 0 27,952 <br />TOTAL - FINISHES $203,961 $0 $2a3,961 7.21 <br />Fourth Floor Tenant Improvements Detail Estimate - Page 4 <br />