Laserfiche WebLink
Courtho`use Square <br />Court 8 High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Desiqn Development Probable Cost Estimate <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczoikowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portiand, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />Estimate Date: R18-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 1&Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: <br />99 <br />Fourth Floor <br />Total Area 2g,Z7g <br />28,279 sf <br />Fourth Fioor Tenant Finishes Quanti Unit Cost/Unit Cost Total Comments <br />' METALS <br />Miscellaneous metals <br />miscellaneous <br />28,279 sf 0.07 1,980 <br />'[,98ti <br />Subtotal 1,980 ' 0 ' ~,980 <br />TOTAL - METALS ~1,980 ' $0 $1,980 0.07 <br /> WOOD & PLASTICS <br /> Rough carpentry <br /> miscellaneous blocking & backing 28,279 sf 0.10 2,828 2,828' <br /> Subtotal 2,828 ' 0 2,828 <br /> Finish carpentry <br /> item 1 sum 0.00 0 0' NIC <br /> Subtotal 0 0 0 <br /> Casework plastic laminate <br /> break room <br /> base cabinet 12.0 If 165.00 " 1,980 1,;980: <br /> wall cabinet 12.0 If 85.00 1,020 1,020' <br /> rod & shelf 7.0 If 20.00 140 140 <br /> large conference <br /> base cabinet 6.0 If 185.00 1,110 1,110 <br /> wellness center <br /> base cabinet 25.0 If 165.00 4,125 4,125' <br />_ co / work <br /> base cabinet 14.0 If 165.00 2,310 2,31Q <br /> wall cabinet 14.0 If 85.00 1,190 1,190` <br /> waiting <br /> rod & shelf 7.0 If 20.00 140 140 <br />Fourth Floor Tenant Improvements Detail Estimate - Page 1 <br />