My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Courthouse Square Costs (Notebook)
>
CS_Courthouse Square
>
Courthouse Square Costs (Notebook)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:06:45 AM
Creation date
9/6/2011 10:49:40 AM
Metadata
Fields
Template:
Building
RecordID
10323
Title
Courthouse Square Costs (Notebook)
Company
Architectural Cost Consultants
BLDG Date
8/1/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courth~use Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Architec~ural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />Estimate Date: R18-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 18-Aug-98 <br />Print Time: 05:44 PM <br />Construction Start: Sprinq 99 <br />Third Floor <br />Total Area 2g,27g <br />28,279 sf <br />sf <br />Third Floor Tenant Finishes Quanti Unit Cost/Unit Cost Total Comments <br /> <br />' MECHANICAL <br />HVAC <br />HVAC system 28,279 sf 3.50 98,977 g8;g77 <br />Subtotal 98,977 0 9$,977 3.50 <br />Plumbing <br />sinks 1 fixt. 2,500.00 2,500 2,500 <br />Subtotal 2,500 0 2,500 0.09 <br />Fire sprinklers <br />sprinklers 28,279 sf 0.50 14,140 44,140 <br />Subtotal 14,140 0 44, 440 0.50 <br />TOTAL - MECHANICAL $115,616 $0 $115,616 4.09 <br />ELECTRICAL <br />Power & Lighting 28,279 sf 4.00 113,116 113,116 <br />Subtotal 113,116 0 113;116 <br />TOTAL - ELECTRICAL ~113,116 $0 $113,116 4.00 <br /> <br />SUBTOTAL _ 5~8,624 $578,624 0 578,624 <br />GENERAL CONDITIONS 7.75% " 44,843 0 44,843 <br /> <br />ESTIMATING CONTINGENCY <br />INDEX TO CONSTRUCTION START . o , <br />7.00% 45,279 <br />Spring 99 0.75% 5,191 $118,694 <br />0 <br />0 ~3 0 <br />45,279 <br />5,191 <br /> <br />@ t 3% per year <br />TOTAL DIRECT CONSTRUCTION COST <br />Third Floor Tenant Finishes <br />28,279 sf $24.66 /sf $697,318 <br />$'0 <br />$697.3'48 <br />Third Floor Tenant Improvements Detail Estimate - Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.