Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />/ ~~ <br />~ <br />~~ <br />Component <br />Parking <br />Bus Mall <br />Building Shell & Core <br />Street Scape <br />Transit <br />Solid Waste <br />d~ TERNATES <br />1 Parking Altemate 1 <br />~ 2 Parking Altemate 2 <br />3 ERR <br />4 ERR <br />Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 j <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 ' <br />6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 I <br />Portland, Oregon 97221 Print Time: 05:44 PM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 ~ <br />STRUCTION COST - PARTNERS SUMMARY <br />Area <br />70,793 sf <br />66,528 sf <br />153,343 sf <br />33,720 sf <br />104,013 sf <br />5,932 sf <br />4,945 sf <br />23,278 sf <br />19,467 sf <br />~/ SF Cost Totals I Comments <br />29.67 2,100,362 52,100,362 i <br />37.34 2,483,907 $2,483,907 0 ~~~ ~~~ ~ I/ <br />71.62 10,982,082 $10,982,082 ~ ~ <br />50.20 1,692,690 51,692,690 <br />1 ~ ~°S ~ I <br />30.95 3,219,379 a3,375,476 V~~~ ~~ C' ~' <br />26.31 156,097 ~- , ~~}y~ `~ <br />J ~, <br />141.64 700,390 5700,390 <br />Add t 932,100 <br />Add t 686,200 <br />ERR <br />ERR <br />The above estimates are for direct construction cost only. They do not include furnishings & equipment, consultant <br />fees, inspection and testing fees, plan check fees, hazardous material testing and ~emoval, financing costs, nor any <br />other normally associated development costs. <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major <br />sub-trades as well as the general contractors. All work to be contracted at one time (shell & core, street & bus mall and <br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The above estimates assume a construction start date of: Spring 99 If the start of construdion is delayed <br />beyond the date above, the estimates must be indexed at a rate of 4-6°k per year compounded. <br />~ <br />Partner Summary - Page 2 <br />