My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Courthouse Square Costs (Notebook)
>
CS_Courthouse Square
>
Courthouse Square Costs (Notebook)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:06:45 AM
Creation date
9/6/2011 10:49:40 AM
Metadata
Fields
Template:
Building
RecordID
10323
Title
Courthouse Square Costs (Notebook)
Company
Architectural Cost Consultants
BLDG Date
8/1/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cou~thouse Square Architectural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbudcle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probabie Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: S ring 99 <br />Altemates Quantitv Unit Cost/Unit Cost Total Comments <br />MECHANICAL <br />HVAC <br />ventilation / exhaust system 23,278 sf 2.15 50,048 <br />ef-4 ea 0.00 0 <br />ductwork cfm 0.00 0 <br />controls ea 0.00 0 <br />balancing sum 0.00 0 <br />Subtotal 50,04 2.15 <br />Plumbing <br />floor drains 2 ea 450.00 900 <br />underslab piping 30 If 30.00 900 <br />Subtotal 1,80 0.08 <br />Fire sprinklers <br />dry system 23,278 sf 1.55 36,081 <br />Subtotal 36,081 1.55 <br />TOTAL - MECHANICAL 587,92 3.78 <br />basic materials & power distribution 23,278 sf 1.70 39,573 <br />Subtotal <br />1.70 <br />TOTAL- <br />SUBTOTAL 79~,959 5791,95 <br />GENERAL CONDITIONS 7.75% 61,377 <br />GENERAL CONTR. FEE 3.75% 32,000 <br />ESTIMATING CONTINGENCY 4.50°/a 39,840 <br />INDEX TO CONSTRUCTION START Spring 99 0.75% 6,939 @ t 3% per year <br /> 140,1 <br />TOTAL DIRECT CONSTRUCTION COST <br />Parkin Altemate 1 23,2T8 sf ~ a40.04 5932,11 <br />~ <br />Altemates - Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.