Laserfiche WebLink
Courthouse Square Architectural Cost Consultants, LLC Estimate ~ate: R18-Aug-98 <br />Couft & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbudcle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construd'an Start: Spring 99 <br />IAitemates I QuantiN Unit CosWnit Cost Total II Comments I <br />WOOD & PLASTICS <br />Rough carpentry <br />miscellaneous blocking 1 sum 500.00 500 <br />Subtotal 50 <br />TOTAL - WOOD & PLASTICS 550 0.02 <br />~ <br />MOISTURE - THERMAL CONTROL <br />Waterproofing & Damproofing <br />waterproofing @ supported slab 23,278 sf 2.75 64,015 <br />waterproof foundation walls 2,859 sf 3.00 8,577 <br />Subtotal 72,59 <br />Traffic Coating <br />parking level 23,278 sf 0.00 0 NIC <br />Subtotal <br />Insulation <br />Rigid insulation <br />roof R-19 0 sf 0.00 0 NIC <br />exterior concrete wall R-11 0 sf 0.00 0 NIC <br />Subtotal <br />Flashing & Sheet Metal <br />miscellaneous 1 sum 1,000.00 1,000 <br />Subtotal 1,00 <br />Caulking 8~ Sealants <br />caulking 23,278 sf 0.10 2,328 <br />Subtotal 2,328 <br />TOTAL - MOISTURE - THERMAL CONT ROL 575,919 3.26 <br />DOORS, WINDOWS & GLASS <br />Doors <br />stairs 4 ea 975.00 3,900 <br />Subtotal 3,900 <br />Ovefiead & Coiling Grilles & Doors <br />roll-down fire door 0 sf 0.00 0 NIC <br />Subtotal 0 <br />TOTAL - DOORS, WINDOWS & GLASS 53,900 0.17 <br />~ <br />Alternates - Page 4 <br />