My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Courthouse Square Costs (Notebook)
>
CS_Courthouse Square
>
Courthouse Square Costs (Notebook)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:06:45 AM
Creation date
9/6/2011 10:49:40 AM
Metadata
Fields
Template:
Building
RecordID
10323
Title
Courthouse Square Costs (Notebook)
Company
Architectural Cost Consultants
BLDG Date
8/1/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square Architecfural Cost Consultants, LLC Estimate Date: R18-Aug-98 <br />Court & High Street .lames A. .lerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 18-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 05:44 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />Fifth Floor <br />Transit 10,918 <br />Solid Waste 5,932 <br />Total Area 16,850 sf sf <br />Fifth Floor Tenant Finishes Quanti Unit CosUUnit Cost Total Comments <br />FINISHES - Continued <br />Carpet <br />type 1 31 sy 21.62 670 <br />type 2 123 sy 20.96 2,578 <br />type 3 1,007 sy 26.10 26,283 <br />type 10 642 sy 19.89 12,769 <br />base <br />type 1 300 If 3.05 915 <br />rype 10 1,305 If 2.85 3,719 <br />Subtotal <br />Paint & wallcoverings <br />concrete sealer <br />@ transit expansion 2,145 sf 0.35 751 <br />@ county expansion 8,625 sf 0.35 3,019 <br />paint / finish door 8~ frame 35 ea 60.00 2,100 <br />solid waste 18 ea 60.00 1,080 <br />paint / finish relite frames 17 ea 40.00 680 <br />paint gypboard ceilings <br />epoxy paint 322 sf 0.75 242 <br />paint walls 22,785 sf 0.45 10,253 <br />solid waste 11,564 sf 0.45 5,204 <br />vinyl wall covering <br />toilets 585 sf 1.50 878 <br />typical 2,125 sf 1.50 3,188 <br />miscellaneous specialty painting 1 sum 1,500.00 1,500 <br />Subtotal <br />TOTAL - FINISHES <br /> 67a'. <br /> . 2,57~' <br /> 26,283' <br /> 1'2,769 <br /> 915' <br /> 3,719' <br />46,935 0 30,446' 1'6,489 <br /> 751 <br /> 3,Q19 _ <br /> 2,100' <br /> 1;080 <br /> 680 <br /> 242 <br /> 10,253 <br /> 5,204` <br /> 878 allowance - verify <br /> 3,188 <br /> 972 528 <br />~ , <br />77,143 ' $3.019 $1!18.824 $55.300'-- 10.51 <br />Fifth Floor Tenant Improvements Detail Estimate - Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.