Laserfiche WebLink
~ ~ ~ ~ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />~Streetscape <br />SITE WORK - Continued <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />Hardscape <br />AC pavement <br />patch @ street <br />pavement markings <br />restripe street <br />parking stalls @ street <br />concrete pavement <br />6" slab on grade, broom finish <br />6" rat slab <br />2" exposed aggregate <br />2" colored concrete <br />waterproof inembrane <br />curb <br />curb & gutter <br />flush curb & gutter <br />brick & tile pavers <br />8" x 8" tile pavers <br />4" x 8" brick paver trim @ above <br />premium pavers @ highlite circles <br />brick paver trim @ above (circular) <br />Subtotal <br />'~ Street Fumiture <br />I benches, t 6'0" length <br />I tree grates 48" x 48" <br />trash receptacles <br />free standing planters <br />bicycle racks <br />telephone booths <br />, mail boxes <br />banner brackets <br />' banners <br />I, flagpole & base <br />' Subtotal <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />_ _- - - - - ----- <br />Quantity Unit Cost/Unit Cost Total <br />8,284 sf 1.85 15,325 <br />205 If 1.65 338 <br />42 ea 3.00 126 <br />6,470 sf 4.00 25,880 <br />27,250 sf 3.55 96,738 <br />12,873 sf 2.75 35,401 <br />1,164 sf 2.90 3, 376 <br />925 sf 3.00 2,775 <br />1,207 If 11.50 13,881 <br />424 If 10.00 4,240 <br />10,547 sf 8.00 84,376 <br />3,206 If 12.00 38,472 <br />435 sf 15.00 6,525 <br />189 If 20.00 3,780 <br /> $3~ <br />10 ea 900.00 9,000 <br />49 ea 750.00 36,750 <br />11 ea 1,000.00 11,000 <br />0 ea 2,500.00 0 <br />4 ea 500.00 2,000 <br />0 ea 0.00 0 <br />0 ea 0.00 0 <br />60 ea 350.00 21,000 <br />60 ea 0.00 0 <br />2 ea 3,000.00 6,000 <br /> 8 <br />~ ~ ~ ~ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />~ Construction Start: S nn 99 <br />_ _ i --- - --_ ..p . 9 <br />- - ---- --_ ~ <br />Comments <br /> 15,325 <br /> 338 <br /> 126 <br /> 25,880 <br /> 96,738 <br /> 35,401 <br /> 3,376 <br /> 2,775 <br /> 13,881 <br /> 4,240 <br /> 84,376 <br /> 38,472 <br /> 6,525 <br /> 3,780 <br />1,232 $0 $0 $331,232 <br /> 9,000 <br /> 36,750 <br /> 11,000 <br /> 0 <br /> 2,000 <br /> 0 <br /> 0 <br /> 21,000 <br /> 0 <br /> 6,000 <br />5,750 0 0 85,750 <br />~ee detail 3/A1.3.1 <br />~erifY qty <br />NIC <br />rerify qty <br />NIC - By Others <br />NIC - By Others <br />NIC - By Others <br />Streetscape Detail Estimate - Page 3 <br />