<br />Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />~Streetscape
<br />SITE WORK - Continued
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~
<br />Hardscape
<br />AC pavement
<br />patch @ street
<br />pavement markings
<br />restripe street
<br />parking stalls @ street
<br />concrete pavement
<br />6" slab on grade, broom finish
<br />6" rat slab
<br />2" exposed aggregate
<br />2" colored concrete
<br />waterproof inembrane
<br />curb
<br />curb & gutter
<br />flush curb & gutter
<br />brick & tile pavers
<br />8" x 8" tile pavers
<br />4" x 8" brick paver trim @ above
<br />premium pavers @ highlite circles
<br />brick paver trim @ above (circular)
<br />Subtotal
<br />'~ Street Fumiture
<br />I benches, t 6'0" length
<br />I tree grates 48" x 48"
<br />trash receptacles
<br />free standing planters
<br />bicycle racks
<br />telephone booths
<br />, mail boxes
<br />banner brackets
<br />' banners
<br />I, flagpole & base
<br />' Subtotal
<br />Architectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503)297-7210 Fax (503)297-7187
<br />_ _- - - - - -----
<br />Quantity Unit Cost/Unit Cost Total
<br />8,284 sf 1.85 15,325
<br />205 If 1.65 338
<br />42 ea 3.00 126
<br />6,470 sf 4.00 25,880
<br />27,250 sf 3.55 96,738
<br />12,873 sf 2.75 35,401
<br />1,164 sf 2.90 3, 376
<br />925 sf 3.00 2,775
<br />1,207 If 11.50 13,881
<br />424 If 10.00 4,240
<br />10,547 sf 8.00 84,376
<br />3,206 If 12.00 38,472
<br />435 sf 15.00 6,525
<br />189 If 20.00 3,780
<br /> $3~
<br />10 ea 900.00 9,000
<br />49 ea 750.00 36,750
<br />11 ea 1,000.00 11,000
<br />0 ea 2,500.00 0
<br />4 ea 500.00 2,000
<br />0 ea 0.00 0
<br />0 ea 0.00 0
<br />60 ea 350.00 21,000
<br />60 ea 0.00 0
<br />2 ea 3,000.00 6,000
<br /> 8
<br />~ ~ ~ ~
<br />Estimate Date: R21-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Print Time: 11:20 AM
<br />~ Construction Start: S nn 99
<br />_ _ i --- - --_ ..p . 9
<br />- - ---- --_ ~
<br />Comments
<br /> 15,325
<br /> 338
<br /> 126
<br /> 25,880
<br /> 96,738
<br /> 35,401
<br /> 3,376
<br /> 2,775
<br /> 13,881
<br /> 4,240
<br /> 84,376
<br /> 38,472
<br /> 6,525
<br /> 3,780
<br />1,232 $0 $0 $331,232
<br /> 9,000
<br /> 36,750
<br /> 11,000
<br /> 0
<br /> 2,000
<br /> 0
<br /> 0
<br /> 21,000
<br /> 0
<br /> 6,000
<br />5,750 0 0 85,750
<br />~ee detail 3/A1.3.1
<br />~erifY qty
<br />NIC
<br />rerify qty
<br />NIC - By Others
<br />NIC - By Others
<br />NIC - By Others
<br />Streetscape Detail Estimate - Page 3