Laserfiche WebLink
~ ~ ~ ~ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />-__ _ _ <br />~Streetscape _ - <br />DEMOLITION <br />sawcut ac pavement <br />remove ac pavement <br />remove concrete pavement <br />remove curb & gutter <br />remove stump <br />remove foundation <br />remove light poles <br />hazardous material removal <br />misc. removal, cut & patch <br />; haul & disposal <br />Subtotal <br />- <br />, TOTAL - DEMOLITION <br />SITE WORK <br />Earthwork <br />'~ level & grade <br />!, dewatering <br />~ mobilization <br />Subtotal <br />' Utilities <br />storm drain system <br />catch basin <br />, manhole <br />I connect to existing <br />II piping <br />6" <br />~~~ $,~ <br />I ~ ~~~ <br />I 12" <br />~ 15" <br />~~ Subtotal <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />~ Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />~ 6441 SW Canyon Court, Suite 103 <br />I <br />I Portland, Oregon 97221 <br />~ Phone (503)297-7210 Fax (503)297-7187 <br />- - <br />~ Quantity Unit CosUUnit Cost Total ~ <br /> 2,508 If $1.50 $3,762 <br /> 17,153 sf 0.45 7,719 <br /> 2,180 sf 0.95 2,071 <br /> 1,512 If 2.25 3,402 <br /> 1 sum 50.00 50 <br /> 1 sum 2,500.00 2,500 <br /> 6 ea 175.00 1,050 <br /> 0 sum 0.00 0 <br /> 1 sum 2,500.00 2,500 <br /> 1 sum 2,300.00 2,300 <br /> -- -- -_ <br />$25,354 <br /> ~25,354 <br /> 3,762 <br /> 7,719 <br /> 2,071 <br /> 3,402 <br /> 50 <br /> 2,500 <br /> 1,050 <br /> 0 <br /> 2,500 <br /> 2,300 <br />$0 $0 $25,354 <br />$0 $0 _$25,354 <br />- - - - -- ___ _ L -~----~ <br />32,795 sf <br />1 sum <br />1 sum <br />11 If <br />1 If <br />1 If <br />0.75 24,596 <br />5,000.00 5,000 <br />15,000.00 15,000 <br />750.00 8,250 <br />2,000.00 2,000 <br />1, 000.00 1, 000 <br />22.00 3,564 <br />24.00 3,456 <br />28.00 1,904 <br />30.00 1,440 <br />34.00 38,930 <br /> $60,544 <br />$44,596 <br />$0 <br />24,596 <br />5,000 <br />15,000 <br />$0 $44,596 <br />162 If <br />144 If <br />68 If <br />48 If <br />1,145 If <br />Streetscape Detail Estimate - Page 1 <br />~ ~ ~ ~ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />, Construction Start: Spring 99 <br />Comments ~ <br />-- --- ___~ <br />8,250 <br />2,000 <br />1,000 <br />3,564 <br />3,456 <br />1,904 <br />1,440 <br />8,930 <br />0,544 <br />NIC - By Others (if requ <br />