Laserfiche WebLink
~ <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~ ~ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />COUrt & High Stfeet James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Sa~em, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 _ _ _ Construction Start: Spring 99 <br />~Bus Mall ~ Quantity Unit Cost/Unit Cost Total Comments <br />SITE WORK - Continued <br />Gates / Fences / Overhead Grilles <br />security gate @ bridges (4 ea) <br />lifting towers <br />truss 8~ pipe frame <br />mesh panel <br />operating / lifting mechanism for above <br />security gates @ arcade entries <br />temp security fence @ nw crnr <br />temp fence @ future development <br />Subtotal <br />Miscellaneous <br />bus mall canopy <br />columns <br />canopy framing <br />, misc bracing, cross bracing, cable, etc <br />column tops <br />gutters <br />overhead glazing system <br />paint exposed steel <br />, 1'/:' rod <br />pedestrian canopy <br />north arcade <br />~, south building elevation <br />north arcade <br />precast concrete base <br />6" cmu backup <br />brick veneer <br />I soldier course <br />j steel framing <br />! parapet / top flashing / cap <br />soffits / ceilings <br />Subtotal <br />~ TOTAL - SITE WORK <br />8.1 ton 3,000.00 24,394 <br />12,765 Ibs 1.65 21,062 <br />3,404 sf 12.00 40,848 <br />4 ea 35,000.00 140,000 <br />1,080 sf 55.00 59,400 <br />42 If 15.00 630 <br />312 If 15.00 4,680 <br /> 291,01~ <br />26.9 ton 3,000.00 80,784 <br />40.8 ton 3,000.00 122,472 <br />4.4 ton 2,500.00 11,010 <br />24.0 ea 350.00 8,400 <br />614 If 12.00 7,368 <br />9,945 sf 27.30 271,499 <br />4,184 If 3.50 14,644 <br />1,296 If 1.75 2,268 <br />1,440 sf 55.00 79,200 <br />1,440 sf 55.00 79,200 <br />896 sf 40.00 35,840 <br />6,532 sf 8.50 55,522 <br />4,276 sf 18.25 78,037 <br />1,360 If 27.00 36,720 <br />14.4 ton 3,000.00 43,146 <br />1,384 sf 12.00 16,608 <br />1,384 sf 8.00 11,072 <br /> 953,78! <br />S2,o77,431 <br /> 24,394 <br /> 21,062 <br /> 40,848 <br /> 140,000 <br /> 59,400 <br /> 630 <br /> 4,680 <br />0 0 291,014 <br /> 80,784 <br /> 122,472 <br /> 11,010 <br /> 8,400 <br /> 7,368 <br /> 271,499 <br /> 14,644 <br /> 2,268 <br /> 79,200 <br /> 79,200 <br /> 35,840 <br /> 55,522 <br /> 78,037 <br /> 36,720 <br /> 43,146 <br /> 16,608 <br /> 11,072 <br />~ 0 0 953,789 <br />~ $0 $0 $2,077,436 <br />rerify <br />12" dia. x-strong pipe <br />price per Dea Mor <br />Bus Mall Detail Estimate - Page 3 <br />