<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />COUrt & High Stfeet James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Sa~em, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM
<br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 _ _ _ Construction Start: Spring 99
<br />~Bus Mall ~ Quantity Unit Cost/Unit Cost Total Comments
<br />SITE WORK - Continued
<br />Gates / Fences / Overhead Grilles
<br />security gate @ bridges (4 ea)
<br />lifting towers
<br />truss 8~ pipe frame
<br />mesh panel
<br />operating / lifting mechanism for above
<br />security gates @ arcade entries
<br />temp security fence @ nw crnr
<br />temp fence @ future development
<br />Subtotal
<br />Miscellaneous
<br />bus mall canopy
<br />columns
<br />canopy framing
<br />, misc bracing, cross bracing, cable, etc
<br />column tops
<br />gutters
<br />overhead glazing system
<br />paint exposed steel
<br />, 1'/:' rod
<br />pedestrian canopy
<br />north arcade
<br />~, south building elevation
<br />north arcade
<br />precast concrete base
<br />6" cmu backup
<br />brick veneer
<br />I soldier course
<br />j steel framing
<br />! parapet / top flashing / cap
<br />soffits / ceilings
<br />Subtotal
<br />~ TOTAL - SITE WORK
<br />8.1 ton 3,000.00 24,394
<br />12,765 Ibs 1.65 21,062
<br />3,404 sf 12.00 40,848
<br />4 ea 35,000.00 140,000
<br />1,080 sf 55.00 59,400
<br />42 If 15.00 630
<br />312 If 15.00 4,680
<br /> 291,01~
<br />26.9 ton 3,000.00 80,784
<br />40.8 ton 3,000.00 122,472
<br />4.4 ton 2,500.00 11,010
<br />24.0 ea 350.00 8,400
<br />614 If 12.00 7,368
<br />9,945 sf 27.30 271,499
<br />4,184 If 3.50 14,644
<br />1,296 If 1.75 2,268
<br />1,440 sf 55.00 79,200
<br />1,440 sf 55.00 79,200
<br />896 sf 40.00 35,840
<br />6,532 sf 8.50 55,522
<br />4,276 sf 18.25 78,037
<br />1,360 If 27.00 36,720
<br />14.4 ton 3,000.00 43,146
<br />1,384 sf 12.00 16,608
<br />1,384 sf 8.00 11,072
<br /> 953,78!
<br />S2,o77,431
<br /> 24,394
<br /> 21,062
<br /> 40,848
<br /> 140,000
<br /> 59,400
<br /> 630
<br /> 4,680
<br />0 0 291,014
<br /> 80,784
<br /> 122,472
<br /> 11,010
<br /> 8,400
<br /> 7,368
<br /> 271,499
<br /> 14,644
<br /> 2,268
<br /> 79,200
<br /> 79,200
<br /> 35,840
<br /> 55,522
<br /> 78,037
<br /> 36,720
<br /> 43,146
<br /> 16,608
<br /> 11,072
<br />~ 0 0 953,789
<br />~ $0 $0 $2,077,436
<br />rerify
<br />12" dia. x-strong pipe
<br />price per Dea Mor
<br />Bus Mall Detail Estimate - Page 3